COMPENSATING CHANGE ORDER NO. 2
<br />•LAKE DRIVE/APOLLO DRIVE
<br />CITY OF LINO LAKES, MINNESOTA
<br />COMMISSION NO. 12428-01
<br />ITEM MnDOT
<br />NO. NO. DESCRIPTION
<br />89 2854.603 4" SOLID UNE YELLOW -PAINT
<br />90 2584.603 4" DOUBLE SOLID UNE YELLOW -PAINT
<br />91 2584.603 8" BROKEN LINE WHITE -PAINT
<br />92 2584.603 24 SOLID UNE YELLOW -POLY PREFORMED
<br />93 2584.818 ZEBRA CROSSWALK WHITE -POLY PREFORMED
<br />94 2565.511 FULL 7 ACT 7 CONTROL SIGNAL SYSTEM A
<br />95 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM B
<br />96 2565.801 EMERGENCY VEHICLE PREEMPTION SYSTEM A
<br />97 2585.601 EMERGENCY VEHICLE PREEMPTION SYSTEM B
<br />98 2565.601 TRAFFIC CONTROL INTERCONNECTION
<br />99 2573.501 BALE CHECK AT CATCH BASIN
<br />100 2573.603 SILT FENCE. TYPE MACHINE SLICED
<br />101 2575.501 SEEDING. MIXTURE 801
<br />102 2575.505 SODDING, TYPE SALT RESISTANT
<br />SUBTOTAL COMPENSATING CHANGE ORDER NO. 2
<br />November 30, 2003
<br />CONTRACT QUANTITY +1- UNIT AMOUNT NET CONTRACT
<br />UNIT QUANTITY TO DATE DIFFERENCE PRICE TO DATE CHANGE AMOUNT
<br />LF 6,318 11,437.0 5,121.0 $ 0.14 $ 1,601.18 $ 716.94 $ 884.24
<br />LF 455 1,127.0 672.0 $ 0.26 $ 315.58 $ 188.16 $ 127.40
<br />LF 81 (81.0) $ 0.50 $ $ (40.50) $ 40.50
<br />LF 170 150.0 (20.0) $ 12.00 $ 1,800.00 $ (240.00) $ 2,040.00
<br />SF 1,062 1,044.0 (18.0) $ 8.00 $ 8,352.00 $ (144.00) $ 8,498.00
<br />SIG SYS 1.00 1.03 0.0 $ 151,000.00 $ 155,530.00 $ 4,530.00 $ 151,000.00
<br />SIG SYS 1.00 1.0 - $ 122,000.00 $ 122,000.00 $ - $ 122,000.00
<br />LS 1.00 1.0 - $ 3,700.00 $ 3,700.00 $ • $ 3,700.00
<br />LS 1.00 1.0 • $ 3,200.00 $ 3,200.00 $ • $ 3,200.00
<br />LS 1.00 1.0 - $ 3,900.00 $ 3,900.00 $ - $ 3,900.00
<br />EA 50.00 (50.0) $ 6.00 $ - $ (300.00) $ 300.00
<br />LF 3,000.00 1,320.0 (1,880.0) $ 1.00 $ 1,320.00 $ (1,080.00) $ 3,000.00
<br />ACRE 0.70 0.9 0.2 $ 2,000.00 $ 1,860.00 $ 480.00 $ 1,400.00
<br />SY 14,000.00 15,872.0 1,672.0 $ 1.80 $ 28,209.80 $ 3,009.60 $ 25,200.00
<br />$ 1,465,020.54 $ (16,254.78) $ 1,481,275.30
<br />$1,465,020.54 $ (16,254.76) $ 1,461,275.30
<br />CHANGE ORDER NO. 1
<br />1 ADDITIONAL TRAFFIC CONTROL PER ANOKA COUNTY LS 1.0 1.0 $ 18,940.00 $ 18,940.00 $ $ 16,940.00
<br />2 ADDITIONAL SIGNS FOR SIGNALS PER ANOKA COUNTY LS 1.0 1.0 $ 739.75 $ 739.75 $ $ 739.75
<br />3 POND CONSTRUCTION AS REQUIRED BY RICE CREEK
<br />WATERSHED DISTRICT LS 1.0 1.0 $ 9,020.00 $ 9,020.00 $ $ 9,020.00
<br />CHANGE ORDER NO. 1 $ 26,699.75 $ $ 26,899.75
<br />TOTAL COMPENSATING CHANGE ORDER NO. 2
<br />$1,491,720.29 $ (16,254.76) $ 1,507,975.05
<br />
|