Laserfiche WebLink
ESTIMATE NO. 5 <br />*STRERECONSTRUCTION <br />OF LINO LAKES, MINNESOTA <br />ET <br />MISSION NO. 12390-03 <br />PERIOD ENDING: December 1, 2003 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />3 ADD NATIVE PLANTINGS AND SEEDING (GRASSES/FORBS/ <br />WILDFLOWERS) AROUND THE STORM PONDS PER RICE CREEEK <br />WATERSHED DISTRICT REQUIREMENT. (SEEDING REDUCED BY 1 <br />ACRE) ACRE 1.0 1.00 $ 1,182.02 $ 1,182.02 <br />4 ADD STORMWATER QUALITY POND AT SECOND AVENUE AND LAKE <br />DRIVE PER RICE CREEK WATERSHED DISTRICT REQUIREMENT. <br />MOBILIZATION LS 1.0 1.0 $ 1,800.00 $ 1,800.00 <br />CLEARING EA 40.0 40.0 $ 125.00 $ 5,000.00 <br />GRUBBING EA 40.0 40.0 $ 50.00 $ 2,000.00 <br />POND EXCAVATION CY 1,010.0 1,010.0 $ 11.00 $ 11,110.00 <br />RANDOM RIP RAP CLASS III CY 9.0 9.0 $ 60.00 $ 540.00 <br />TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />SILT FENCE TYPE PREASSEMBLED LF 365.0 135.0 $ 2.10 $ 283.50 <br />WOOD FIBER BLANKET TYPE II SY 490.0 - $ 1.25 $ - <br />SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, AND <br />DISC ANCHORING) ACRE 0.3 $ 2,000.00 $ <br />5 ADD SANITARY SERVICES <br />CONNECT TO EXISTING SANITARY MH EA 1.0 1.00 $ 300.00 $ 300.00 <br />6" PVC (SDR35) SANITARY SEWER LF 120.0 120.00 $ 20.00 $ 2,400.00 <br />6" X 4" PVC WYES EA 2.0 2.00 $ 200.00 $ 400.00 <br />6" PVC CLEAN OUT EA 1.0 1.00 $ 150.00 $ 150.00 <br />6 ADD SUNSET PEDESTRIAN/BIKEWAY TRAIL EXTENSION <br />MOBILIZATION LS 1.0 1.00 $ 1,000.00 $ 1,000.00 <br />0 COMMON EXCAVATION CY 193.0 193.00 $ 10.51 $ 2,028.43 <br />AGGREGATE BASE, CLASS 5 TON 210.0 210.00 $ 6.80 $ 1,428.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 49.0 49.00 $ 39.05 $ 1,913.45 <br />REMOVE C&G LF 8.0 8.00 $ 2.50 $ 20.00 <br />SODDING TYPE SALT RESISTANT SY 1,552.0 1,552.00 $ 1.80 $ 2,793.60 <br />7 ADD FOR ADDITIONAL REMOVAL AND REPLACEMENT OF <br />PEDESTRIAN/BIKEWAY TRAIL <br />REMOVE BITUMINOUS SURFACING SY 895.0 895.00 $ 1.55 $ 1,387.25 <br />COMMON EXCAVATION CY 415.0 415.00 $ 10.51 $ 4,361.65 <br />AGGREGATE BASE, CLASS 5 TON 355.0 355.00 $ 6.80 $ 2,414.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 108.0 108.00 $ 39.05 $ 4,217.40 <br />8 ADD LARGER AREA'S SODDING AND SEEDING QUANTITIES. ADD <br />SODDING TYPE SALT RESISTANT (SEEDING REDUCED BY 1.7 <br />ACRES) SY 8,022.0 $ 1.80 $ <br />9 ADD STORM MANHOLE SUMP SECTION PER RICE CREEK <br />WATERSHED DISTRICT REQUIREMENT. ADD 5' DIA. SUMP MANHOLE <br />SECTION (4' DEPTH). EA 2.0 2.00 $ 700.00 $ 1,400.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 189,189.75 <br />TOTAL ESTIMATE NO. 5 <br />a �urin A-rrn nl 1A►Inrf\ A •A rr las AnneNnri A Alf' \AIrrLI f'LIA ',int nonco KIf 4 <br />$ 1,362,805.48 <br />D,„o <br />