My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-228 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2003
>
2003-228 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 9:57:53 AM
Creation date
8/3/2015 9:30:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/15/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />CHANGE ORDER NO. 1 <br />ELM STREET RECONSTRUCTION <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12390-03 <br />DATE: December 9, 2003 <br />ITEM UNIT <br />NO. DESCRIPTION UNIT QUANTITY PRICE AMOUNT <br />CHANGE ORDER NO. 1 <br />1 REDUCTION OF ONE -FOOT OF SELECT GRANULAR BORROW FILL CY (19,500.0) $ 9.15 $ (178,425.00) <br />MATERIAL CY 13,155.0 $ 10.51 $ 138,259.05 <br />2 REDUCTION OF SELECT GRANULAR BORROW QUANTITY AS <br />UNNEEDED UNDER STREET SECTION CY (7,562.0) $ 10.65 $ (80,535.30) <br />3 ADD HIGH EARLY STRENGTH B618 CONCRETE CURB AND GUTTER TO <br />FACILITATE LATE SEASON CONSTRUCTION. LF 4,169.0 $ 0.60 $ 2,501.40 <br />4 ADD F&I NATIVE PLANTINGS AND SEEDING AROUND THE STORM ACRE (1.0) $ 790.00 $ (790.00) <br />PONDS PER RICE CREEK WATERSHED DISTRICT REQUIREMENTS. ACRE 1.0 $ 1,182.02 $ 1,182.02 <br />5 ADD STORMWATER QUALITY POND AT SECOND AVENUE AND LAKE <br />DRIVE PER RICE CREEK WATERSHED DISTRICT REQUIREMENT. <br />MOBILIZATION LS 1.0 $ 1,800.00 $ 1,800.00 <br />CLEARING EA 40.0 $ 125.00 $ 5,000.00 <br />GRUBBING EA 40.0 $ 50.00 $ 2,000.00 <br />POND EXCAVATION CY 1,010.0 $ 11.00 $ 11,110.00 <br />RANDOM RIP RAP CLASS III CY 9.0 $ 60.00 $ 540.00 <br />TRAFFIC CONTROL LS 1.0 $ 300.00 $ 300.00 <br />SILT FENCE TYPE PREASSEMBLED LF 365.0 $ 2.10 $ 766.50 <br />WOOD FIBER BLANKET TYPE II SY 490.0 $ 1.25 $ 612.50 <br />SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, AND <br />DISC ANCHORING) ACRE 0.3 $ 2,000.00 $ 600.00 <br />6 ADD SANITARY SERVICES <br />CONNECT TO EXISTING SANITARY MH EA 1.0 $ 300.00 $ 300.00 <br />6" PVC (SDR35) SANITARY SEWER LF 120.0 $ 20.00 $ 2,400.00 <br />6" X 4" PVC WYES EA 2.0 $ 200.00 $ 400.00 <br />6" PVC CLEAN OUT EA 1.0 $ 150.00 $ 150.00 <br />7 ADD SUNSET PEDESTRIANIBIKEWAY TRAIL EXTENSION <br />MOBILIZATION LS 1.0 $ 1,000.00 $ 1,000.00 <br />COMMON EXCAVATION CY 193.0 $ 10.51 $ 2,028.43 <br />AGGREGATE BASE, CLASS 5 TON 210.0 $ 6.80 $ 1,428.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 49.0 $ 39.05 $ 1,913.45 <br />REMOVE C&G LF 8.0 $ 2.50 $ 20.00 <br />SODDING TYPE SALT RESISTANT SY 1,552.0 $ 1.80 $ 2,793.60 <br />8 ADD FOR ADDITIONAL REMOVAL AND REPLACEMENT OF <br />PEDESTRIANIBIKEWAY TRAIL <br />REMOVE BITUMINOUS SURFACING SY 895.0 $ 1.55 $ 1,387.25 <br />COMMON EXCAVATION CY 415.0 $ 10.51 $ 4,361.65 <br />AGGREGATE BASE, CLASS 5 TON 355.0 $ 6.80 $ 2,414.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 108.0 $ 39.05 $ 4,217.40 <br />9 ADD LARGER ARENS SODDING AND SEEDING QUANTITIES. ADD SY 8,022.0 $ 1.80 $ 14,439.60 <br />SODDING TYPE SALT RESISTANT ACRE (1.7) 790 $ (1,343.00) <br />10 ADD STORM MANHOLE SUMP SECTION PER RICE CREEK WATERSHED <br />DISTRICT REQUIREMENT. ADD 5' DIA. SUMP MANHOLE SECTION (4' <br />DEPTH) EA 2:0 $ 700.00 $ 1,400.00 <br />SUBTOTAL CHANGE ORDER N0.1 $ (55,768.45) <br />
The URL can be used to link to this page
Your browser does not support the video tag.