Laserfiche WebLink
■ <br />IWVB <br />& Assocengineering • planning • environmental • construction <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE and <br />Ed Youngquist <br />Date: August 4, 2015 <br />Re: Morell Borrow Pit Plan Review <br />WSB Project No. 2988-030 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />The Borrow Pit submittal document received on July 12, 2015 and reviewed here within, <br />included the following: <br />1. Full size Final Plan prepared by Plowe Engineering, Inc. dated July 10, 2015. <br />2. Email from Adam Ginkel to Katie Larsen dated August 3, 2015. <br />3. RCWD 15-018 CAPROC <br />General Comments: <br />1. Obtain permits for the project: NPDES permit, City of Lino Lakes grading permit <br />Grading Plan and Drainage Comments: <br />1. Project cannot disrupt or otherwise alter existing surface water drainage patterns. Existing <br />drainage patterns flow from east to west. <br />2. Prevent general public access and maintain safe site conditions per City Ordinance. <br />3. Future filling of the site will require an additional CUP or Site Development Agreement. <br />This CUP and grading permit does not include borrow pit fill. <br />4. Require that all decomposable material, or other unsuitable foundation material, be removed <br />from the area before deposition of fill begins. <br />5. The excavation of land reclamation project shall be completed by November 30, 2015 and <br />the site restored. <br />6. Place a minimum of four (4) inches of topsoil over all disturbed areas, including haul road, <br />and establish ground cover in a time period consistent with the City's SWPPP. <br />7. Show location of rock construction entrance on plan. <br />8. Acquire temporary access easement across city owned property. <br />9. Soil boring data shall be provided. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />S:\CommwityDevelopmmt\Projeas\Plnning Cases\Morell Borrow Pit CUP\Staff Reports\20150812 P&Z\4 20150804 City Engineer Letter Morell Borrow Pit.dm <br />