<br />EROSION CONTROL NOTES
<br />1. Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees
<br />pertaining to this permit. The SWPPP shall be kept onsite at all times.
<br />2. Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior
<br />to beginning any excavation or demolition work at the site.
<br />3. Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall
<br />install temporary earth dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel
<br />to the contours as deemed necessary to further control erosion. All changes shall be recorded in the SWPPP.
<br />4. All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and
<br />from the entrance to a point 50' into the construction zone.
<br />5. The toe of the silt fence shall be trenched in a minimum of 6". The trench backfill shall be compacted with a
<br />vibratory plate compactor.
<br />6. All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment
<br />control practices must be established on all down gradient perimeters before any up gradient land disturbing
<br />activities begin.
<br />7. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 14
<br />days after the construction activity in that portion of the site has temporarily or permanently ceased.
<br />Temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles,
<br />demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots
<br />and similar surfaces are exempt from this requirement.
<br />ROCK CONSTRUCTION
<br />ENTRANCE
<br />8. The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from
<br />any portion of the construction site, or diverts water around the site, must be stabilized within 200 lineal feet
<br />from the property edge, or from the point of discharge into any surface water. Stabilization of the last 200
<br />lineal feet must be completed within 24 hours after connecting to a surface water. Stabilization of the
<br />remaining portions of any temporary or permanent ditches or swales must be complete within 14 days after
<br />connecting to a surface water and construction in that portion of the ditch has temporarily or permanently
<br />ceased.
<br />9. Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water.
<br />10. All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota
<br />Department of Transportation Standard Specifications.
<br />11. All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of
<br />the respective wetland or water body at an elevation where the downstream slope is 1 percent or flatter. The
<br />normal water level shall be the invert elevation of the outlet of the wetland or water body.
<br />12. All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent
<br />runoff from entering the storm sewer system. Catch basins necessary for site drainage during construction
<br />shall be provided with inlet protection.
<br />13. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes)
<br />the erosion control facilities shall be backed by stabilization structure to protect those facilities from the
<br />concentrated flows.
<br />14. Inspect the construction site once every seven days during active construction and within 24 hours after a
<br />rainfall event greater than 0.5 inches in 24 hours. All inspections shall be recorded in the SWPPP.
<br />15. All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment
<br />reaches 1/3 of the height of the fence. These repairs must be made within 24 hours of discovery, or as soon
<br />as field conditions allow access. All repairs shall be recorded in the SWPPP.
<br />16. If sediment escapes the construction site, off-site accumulations of sediment must be removed in a manner
<br />and at a frequency sufficient to minimize off-site impacts.
<br />17. All soils tracked onto pavement shall be removed daily.
<br />18. All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is
<br />reaching the infiltration area and these areas are protected from compaction due to construction equipment
<br />driving across the infiltration area.
<br />19. Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in
<br />surface waters, including stormwater conveyances such as curb and gutter systems, or conduits and ditches
<br />unless there is a bypass in place for the stormwater.
<br />20. Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and
<br />demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal
<br />requirements.
<br />21. Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment,
<br />to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent
<br />vandalism. Storage and disposal of hazardous waste must be in compliance with MPCA regulations.
<br />22. External washing of trucks and other construction vehicles must be limited to a defined area of the site.
<br />Runoff must be contained and waste properly disposed of. No engine degreasing is allowed onsite..
<br />S89°24' 11 "E 1254.95
<br />BIRCH STREET
<br />(C.S.A.H. N
<br />23. All liquid and solid wastes generated by concrete washout operations must be contained in a
<br />leak -proof containment facility or impermeable liner. A compacted clay liner that does not
<br />allow washout liquids to enter ground water is considered an impermeable liner. The liquid
<br />and solid wastes must not contact the ground, and there must not be runoff from the concrete
<br />washout operations or areas. Liquid and solid wastes must be disposed of properly and in
<br />compliance with MPCA regulations. A sign must be installed adjacent to each washout facility
<br />to inform concrete equipment operators to utilize the proper facilities.
<br />24. Upon completion of the project and stabilization of all graded areas, all temporary erosion
<br />control facilities (silt fences, hay bales, etc.) shall be removed from the site.
<br />25. All permanent sedimentation basins must be restored to their design condition immediately
<br />following stabilization of the site.
<br />26. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after
<br />Final Stabilization.
<br />34
<br />911
<br />Property Line - - -
<br />-------------
<br />--
<br />- - - - - - - - - -
<br />- -- 9_ - -X904=- �F _- _ ----- - -
<br />- OE OE
<br />omIns
<br />Proposed Property Line (60' R
<br />Parking Setback
<br />909 -
<br />Building Setback
<br />wAN
<br />mu■■■M■■.,'� .i.��
<br />■■■■■■■i
<br />■■■■■■■N=ray
<br />■_-C■C■Z■. fr
<br />■■■■■■E■•itit
<br />�_■M\■■■■■■,;;'� :�• WIESER•
<br />General Con
<br />or
<br />/
<br />/ /
<br />/ 7 /
<br />/ / /
<br />/ y
<br />0
<br />PROPOSED FIRE STATION i
<br />FFE = 914.50'
<br />(ARCH 100') //
<br />CONCRETE WASHOUT STATION
<br />(LOCATION TO B�DETERMINED)
<br />/r
<br />*jai• - /
<br />// ,� \II,
<br />I\
<br />'
<br />\-,
<br />•-...
<br />V 908,-
<br />�\ ---41
<br />' L wet -"", : 11-
<br />lif"Iii 11.111=1.
<br />05°r' i01
<br />.111-
<br />w
<br />�IICIIL�ueuvp- v -- Alf .,
<br />iIIE�;P=dn n=n�n�n udli`"■■'.1'
<br />I J -
<br />p dl An � �nm ; 111.- 4.0.11 111 .' .r l
<br />_il
<br />-I I 1=1 I 1=1 I = _ _ =1 1=1 1=1 1=1 I "5 7_47______---:-4F1 •■� '
<br />�_= 1=J1� _ _ - - _- - -111-1 �c�- /II
<br />1111 ,-l � -i Ff 1 I _- �1 0
<br />11=111- _-_
<br />I
<br />r
<br />/
<br />/
<br />/
<br />/
<br />/ 1
<br />APPROXIMATE FLOODPLAIN
<br />903.58 PER RCWD
<br />LEGEND
<br />PARCEL A
<br />911 912
<br />N
<br />\
<br />\
<br />0QC I
<br />/
<br />/
<br />/
<br />/
<br />/
<br />7
<br />/
<br />/
<br />/
<br />/
<br />//
<br />/O
<br />dP
<br />�A6
<br />�
<br />QOQp02PPP�P� o
<br />S�00P'��D�otio�10o fP C
<br />o
<br />o
<br />/
<br />/ /
<br />/ /
<br />/
<br />'7/////
<br />/
<br />/
<br />/
<br />/
<br />7-
<br />I i I
<br />P:\Projects\"{ojlecfs - 2014\12146115- Lino Lakes Fire ptation\4. Design\Drewing Files\12146115 C3.1.dwg
<br />/
<br />/
<br />/
<br />/
<br />/
<br />7-
<br />-_
<br />- II S89°24'11 "E 700.16
<br />1
<br />I
<br />i
<br />/
<br />/
<br />\
<br />/
<br />/
<br />1,
<br />/1/
<br />0000000
<br />000
<br />0 0 0 0
<br />SILT FENCE
<br />RIP -RAP / ROCK CONST. ENTRANCE
<br />EROSION CONTROL BLANKET
<br />INLET PROTECTION
<br />r___.1
<br />CONCRETE WASHOUT STATION
<br />wet -
<br />PROPERTY LINE
<br />SETBACK LINE
<br />DELINEATED WETLAND (BY OTHERS)
<br />FLOODPLAIN
<br />WETLAND BUFFER
<br />BASE BID / BID ALTERNATE LIMITS
<br />D
<br />77mmi
<br />0 20
<br />NORTH
<br />40 80
<br />O
<br />N
<br />rn
<br />co
<br />CD
<br />i-.
<br />O
<br />rn
<br />. - (0 co
<br />EZJco
<br />w Mico
<br />0
<br />0
<br />01
<br />0
<br />cB
<br />0>
<br />ac 1-
<br />LU
<br />LL 0 _I W
<br />- Z 0
<br />w D 0 z
<br />CO• O2tQ
<br />zwaw�
<br />QZ
<br />d mIZZCO S z z
<br />l - w Z
<br />▪ lY J
<br />Q ▪ d a Z 0
<br />S w Z O `C
<br />tnw
<br />>a�¢
<br />„ wcw
<br />- 0. 0_ .
<br />>O(i) u-
<br />m 0- 1- ci) 0 ma1-ci)O
<br />LU
<br />0 Q
<br />- 0 O ❑ =-1
<br />0
<br />z
<br />Eric G. Meyer, P.E.
<br />DATE 01/19/15
<br />dr.
<br />1
<br />M
<br />et'
<br />CV
<br />O)
<br />rn
<br />00
<br />1-
<br />4
<br />CV
<br />504 APPLE VALLEY, MN
<br />COMM: 12146115
<br />01/19/15
<br />REVISIONS:
<br />Addendum No. 2
<br />Watershed Submittal
<br />Watershed Comments
<br />Watershed Revs
<br />Watershed Revs
<br />0-3
<br />a)
<br />O
<br />co
<br />0
<br />0
<br />a) 0
<br />(0.c
<br />2
<br />vi
<br />U Y
<br />El J
<br />O 0
<br />� J
<br />Erosion Control
<br />Plan
<br />z
<br />5
<br />H
<br />F
<br />
|