My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-24-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
08-24-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:15 AM
Creation date
9/1/2015 11:38:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/24/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name and/or Number: Centerville Road and Birch Street Turn Lane Project <br />Explain how each proposed action or technique will be completed (e.g. wetland hydrology will be restored by breaking the tile <br />and how the proposal meets the crediting criteria associated with it. Applicants should refer to the Corps mitigation policy <br />language, WCA rule language, and all associated Corps and WCA guidance related to the action or technique: <br />See Wetland Mitigation Plan <br />Attach a site location map, soils map, recent aerial photograph, and any other maps to show the location and other relevant <br />features of each wetland replacement/mitigation site. Discuss in detail existing vegetation, existing landscape features, land use <br />(on and surrounding the site), existing soils, drainage systems (if present), and water sources and movement. Include a <br />topographic map showing key features related to hydrology and water flow (inlets, outlets, ditches, pumps, etc.): <br />See Wetland Mitigation Plan <br />Attach a map of the existing aquatic resources, associated delineation report, and any documentation of regulatory review or <br />approval. Discuss as necessary: <br />See Wetland Mitigation Plan <br />For actions involving construction activities, attach construction plans and specifications with all relevant details. Discuss and <br />provide documentation of a hydrologic and hydraulic analysis of the site to define existing conditions, predict project outcomes, <br />identify specific project performance standards and avoid adverse offsite impacts. Plans and specifications should be prepared by <br />a licensed engineer following standard engineering practices. Discuss anticipated construction sequence and timing: <br />See Wetland Mitigation Plan <br />For projects involving vegetation restoration, provide a vegetation establishment plan that includes information on site <br />preparation, seed mixes and plant materials, seeding/planting plan (attach seeding/planting zone map), planting/seeding <br />methods, vegetation maintenance, and an anticipated schedule of activities: <br />See Wetland Mitigation Plan <br />For projects involving construction or vegetation restoration, identify and discuss goals and specific outcomes that can be <br />determined for credit allocation. Provide a proposed credit allocation table tied to outcomes: <br />See Wetland Mitigation Plan <br />Provide a five-year monitoring plan to address project outcomes and credit allocation: <br />See Wetland Mitigation Plan <br />Discuss and provide evidence of ownership or rights to conduct wetland replacement/mitigation on each site: <br />The city of Lino Lakes currently owns the parcel where the wetland mitigation site is proposed. <br />Quantify all proposed wetland credits and compare to wetland impacts to identify a proposed wetland replacement ratio. Discuss <br />how this replacement ratio is consistent with Corps and WCA requirements: <br />The project will have a proposed impact of 0.43 acres (18,979 square feet). These impacts will need to be replaced at the <br />following ratios, which are outlined in Rice Creek Watershed Districts Rule F: <br />Wetland <br />ID <br />Impact Amount <br />(sf) <br />Impact Area <br />Replacement <br />Ratio <br />Replacement <br />Provided (sf) <br />B <br />6,684 <br />ROW <br />2:1 <br />13,368 <br />B <br />4,382 <br />Outside WMC <br />1:1.5 <br />6,753 <br />C <br />6,424 <br />ROW <br />2:1 <br />12,848 <br />D <br />1,489 <br />ROW <br />2:1 <br />2,978 <br />Total <br />18,925 <br />35,947 <br />On-site mitigation will replace a proposed 0.56 acres (24,393.6 square feet) through creation and restoration. The city is <br />
The URL can be used to link to this page
Your browser does not support the video tag.