My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-24-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
08-24-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:15 AM
Creation date
9/1/2015 11:38:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/24/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NorthPointe 3rd Addition <br />Development Agreement <br />August 2015 <br />d. Aerial Photo Cost Recovery Fees <br />e. Trunk Sewer Unit Charges <br />The City established trunk unit charges to uniformly distribute the costs of public <br />trunk sanitary sewer infrastructure. Each individual connection to the sanitary <br />sewer system shall be charged a unit charge per SAC unit (currently at $3,073 <br />per SAC unit). The unit charge shall be based on the procedure outlined in the <br />Metropolitan Environmental Services Service Availability Charge Procedure <br />Manual. Trunk sewer unit charges addressed under this paragraph are in <br />addition to any SAC charges imposed by Metropolitan Council Environmental <br />Services. An estimate of the total charge and the trunk utility credit for <br />developer installed trunk oversizing is specified in Attachment B. <br />f. Trunk Water Unit Charges <br />g. <br />The City established trunk unit charges to uniformly distribute the costs of public <br />trunk water infrastructure. Each individual connection to the water system shall <br />be charged a unit charge per WAC unit (currently at $4,069 per WAC unit). The <br />unit charge shall be based on the procedure outlined in the Metropolitan <br />Environmental Services Service Availability Charge Procedure Manual. An <br />estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Attachment B. <br />Surface Water Management Area Charges <br />The City established a trunk area charge to uniformly distribute the costs of <br />public trunk surface water infrastructure and water quality improvements. The <br />Surface Water Management Charge shall be based on developable acreage, in <br />the amount specified in Attachment B. <br />17. Assessment of Charges and Waiver of Rights. <br />a. In consideration of the construction of City Improvements listed in Paragraph 8 <br />and /or provision of sewer, water and storm water services, the Developer <br />agrees that the costs of City Improvements together with Trunk Sewer Unit <br />Charge, Trunk Water Unit Charge and the Surface Water Management Area <br />Charge (collectively, "the Charges") may be assessed against the Subdivision <br />parcels. The Developer hereby waives any and all procedural and substantive <br />objections to the special assessments, including notice and hearing <br />requirements, any claim that the assessments exceed the benefit to the <br />properties, and any right to appeal. <br />page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.