Laserfiche WebLink
Lino Lakes I -35E Corridor AUAR Update — 2015 <br />Responses to Comments <br />August 17, 2015 <br />Summarized Comment <br />Response <br />Anoka County Transportation Division <br />Traffic analysis section should be updated due to <br />traffic analysis being done in 2005 and <br />construction of new developments and roadway <br />improvements <br />While the traffic study is from 2005, there have not been significant developments in the <br />area and traffic counts have not increased. Most of the infrastructure has been built when <br />warranted. The Comprehensive Plan Update is due in 2018 so additional traffic <br />modeling/review will be done overall for the City at that time. The City does not plan to <br />update the traffic study at this time for the AUAR Update. <br />Mitigation Description for 21.2.3 states that <br />phase one CSAH 114, 35W to I.35E is funded and <br />programmed for construction but the update <br />states that it was completed in 2009 and noted <br />in the 2010 AUAR Update <br />The Mitigation Description is taken directly from the 2005 AUAR and is not updated for the <br />2015 update. The update column next to the mitigation description contains updated text <br />about the Mitigation Description. The update column reflects the project's current status as <br />of the 2015 update while the Mitigation description reflects the project's status when the <br />AUAR was originally written in 2005. No change has been made to the AUAR. <br />Transportation. 2010 1-35E Corridor Final AUAR <br />report, referenced in 2015 1-35 Corridor AUAR <br />update is not referenced correctly <br />The 2010 Update is on this page http://www.ci.lino-lakes.mn.us/index.asp?SEC=581A5670- <br />E592-4178-B9B2-7B0B72922A8E&Type=B BASIC located in the brown box to the right and <br />is linked here http://www.ci.lino-lakes.mn.us/vertical/Sites/%7B92EFCBF5-B800-4B28- <br />AD6A-B8C3B7009FB0%7D/uploads/AUAR_5_year_update.pdf <br />August 17, 2013 <br />Page 1 of 3 <br />