Laserfiche WebLink
TABLE OF CONTENTS <br />I. INTRODUCTION AND PURPOSE 1 <br />II. 2030 COMPREHENSIVE PLAN 2 <br />III. DEVELOPMENT WITHIN THE STUDY AREA 3 <br />IV. UPDATE TO THE ENVIRONMENTAL REVIEW 3 <br />A. Traffic and Transportation System 3 <br />B. Regional Sanitary Sewer 4 <br />C. Regional Water System 4 <br />D. Potential Environmental Hazards 4 <br />E. Stormwater Management 4 <br />F. Ecologically Sensitive Areas 4 <br />G. Cultural Resources 5 <br />IV. MITIGATION SUMMARY AND UPDATE 5 <br />Appendix A: Figures <br />Appendix B: Agency Correspondence (DNR and SHPO) <br />Appendix C: Potential Environmental Hazards Update <br />Appendix D: Mitigation Plan <br />Five Year Update <br />Lino Lakes I -35E Corridor <br />Alternative Urban Areawide Review <br />WSB Project No. 2029-95 <br />Table of Contents <br />