My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-14-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
09-14-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:56 AM
Creation date
9/29/2015 2:05:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conservation mitigation measures prior to final approval by the city. <br />Implementation of mitigation measures will be assured through developer <br />agreements with the city, which will require a financial security for land and <br />infrastructure improvements and/or revoke the right to acquire building permits <br />and/or certificates of occupancy until all relevant mitigation measures have been <br />addressed. <br />ITEM 15. WATER SURFACE USE <br />Item No. <br />Mitigation Description <br />Update <br />15.1 <br />Consider restricting individual lake access and dock construction along public and <br />private shorelands by encouraging the use of clustered access and dock facilities. <br />This mitigation measure is ongoing <br />ITEM 16. EROSION AND SEDIMENTATION <br />Item No. <br />Mitigation Description <br />Update <br />16.1 <br />Require project proposers to acquire NPDES/SDS General Stormwater Permit for <br />Construction Activity from the MPCA prior to initiating earthwork. <br />This mitigation measure is ongoing <br />16.2 <br />Require project proposers to meet the erosion and sediment control regulations in <br />all applicable regulations, ordinances and rules of the city and MPCA, and Rice <br />Creek Watershed District. <br />This mitigation measure is ongoing <br />16.3 <br />Require project proposers to minimize runoff, improve the quality of runoff, and <br />provide erosion control through BMPs and other low impact development <br />techniques. <br />This mitigation measure is ongoing <br />16.4 <br />Provide construction oversight to ensure designed sediment and erosion control <br />measures are being implemented. <br />This mitigation measure is ongoing <br />8 <br />Mitigation Plan Update - 2015 <br />June 3, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.