My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-14-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
09-14-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:56 AM
Creation date
9/29/2015 2:05:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. The proposed development will not involve uses, activities, processes, materials, <br />equipment and conditions of operation that will be detrimental to any persons, <br />property, or the general welfare because of excessive production of traffic, noise, <br />smoke, fumes, glare, or odors. <br />The proposed earth moving/borrow pit will not be detrimental to any persons or <br />property. Hours of operation, noise and erosion/dust control measures will be enforced. <br />9. The proposed development will not result in the destruction, loss, or damage of a <br />natural, scenic or historic feature of major importance. <br />The proposed earth moving/borrow pit will not result in the destruction, loss or damage <br />of natural, scenic or historic features. The existing wetlands and public ditch system will <br />not be affected by the activities. No scenic or historic features exist in the area; and <br />WHEREAS, in addition to the criteria established under Section 1007.016, Conditional <br />Use Permits, Section 1007.050, Earth Moving and Land Reclamation establishes the <br />following conditions that shall be met: <br />(a) Properly fence any pit or excavation, and barricade entrances to prevent the <br />general public from depositing garbage or refuse. <br />(b) Slope the banks, and otherwise guard and keep any pit or excavation in such <br />condition as not to be dangerous because of sliding or caving banks. <br />(c) Properly drain, fill, or level off any pit or excavation so as to make the same safe <br />and healthful as the permitting authority may determine. <br />(d) Limit the depth of such excavation to an elevation no lower than the minimum <br />floor elevation for building construction as established by the City Engineer, so as not to <br />diminish development potential of the parcel. <br />(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other <br />like and similar non -decomposable material. Concrete, asphalt, metal, wood, and other <br />debris shall be prohibited. No fill material shall be imported on site without City <br />inspection and approval. <br />(f) Require that all decomposable material, or other unsuitable foundation material, <br />be removed from an area before deposition of fill begins. <br />(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br />(h) Specify a time when the excavation or land reclamation project shall be <br />completed. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.