Laserfiche WebLink
additional precipitation durations to determine the critical duration flood event. Analysis of the <br />10 -day snowmelt event is not required for stormwater management detention basins with a <br />defined outlet elevation at or below the 100 -year 24-hour event elevation. <br />4) Water quality treatment. <br />a. Land development activities creating impervious surface shall address the use of better <br />site design (BSD) techniques as outlined in the Better Site Design and Low Impact Development <br />sections of the Minnesota Stormwater Manual (MPCA, 2014 and subsequent revisions). <br />b. The water quality volume standard for all projects, except Public Linear projects, is <br />determined as follows (Table 2): <br />Table 2. Required Water Quality Volume Calculations for New or Reconstructed <br />Deve ouments <br />BMP <br />BMP Design <br />Variation <br />Water Quality Treatment Volume Calculation [ft3J <br />Infiltration <br />Infiltration Feature <br />Impervious surface [ft2] * 1.1 [in] / 12 [in/ft] <br />Water Reuse <br />Irrigation <br />Impervious surface [ft2] * 1.1 [in] / 12 [in/ft] <br />Biofiltration <br />Underdrain <br />Impervious surface [ft2] * 1.1 [in] / (0.65 * 12 <br />[in/ft]) <br />Filtration <br />Sand or Rock Filter <br />Impervious surface [ft2] * 1.1 [in] / (0.50 * 12 <br />[in/ft]) <br />Stormwater <br />Wetlands <br />Shallow Wetland <br />Impervious surface [ft2] * 1.1 [in] / (0.40 * 12 <br />[in/ft]) <br />Pond/Wetland <br />Impervious surface [ft2] * 1.1 [in] / (0.55 * 12 <br />[in/ft]) <br />Stormwater Ponds <br />Wet Pond <br />Impervious surface [ft2] * 1.1 [in] / (0.50 * 12 <br />[in/ft]) <br />Multiple Pond <br />Impervious surface [ft2] * 1.1 [in] / (0.60 * 12 <br />[in/ft]) <br />c. The required water quality treatment volume standard for Public Linear projects is <br />determined as follows: <br />Required Water Area of New or <br />Quality__ Reconstructed x 0.75 — 12 in/ft <br />Treatment Impervious [in] [in/ft] <br />Volume [ft3] Surface [ft2] <br />draft 06-15 ECS Ordinance.docx <br />18/29 <br />