My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-12-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
10-12-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:40:54 PM
Creation date
10/14/2015 11:50:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/12/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Stormwater Management Performance Standards <br />This section was previously subpart 4) and was combined with subpart 2) formerly <br />Stormwater management criteria. <br />Added a provision allowing for the development of a Comprehensive Stormwater <br />Management Plan (CSMP) as an alternative to meeting drainage requirements. <br />3) Stormwater management plan modeling requirements <br />This section was previously 5). <br />Requires the use of NOAA Atlas 14 precipitation data, rather than TP40 consistent <br />with RCWD requirements. <br />4) Water quality treatment <br />This section was previously 6). <br />Revises water quality volume standards for all projects from 2.3 inch threshold to be <br />consistent with RCWD standards (1.1 inch for new and reconstructed developments, <br />.75 inch for public linear projects. <br />Established requirements prohibiting infiltration in groundwater sensitive areas. <br />Deletes .5 inch runoff reduction requirement. <br />5) Peak stormwater runoff control <br />This section was previously 7) <br />Added 10 year frequency event to rate requirements. <br />Wetland bounce and inundation hydroperiod standards were added. <br />6) Design Criteria <br />Moved and updated the soil infiltration rate table from Appendix. <br />Added water reuse design standards. <br />Added 10 year event to detention basin design criteria <br />8) Stormwater management plan required exhibit <br />This section was previously 3). <br />Added/revised submittal information required by Engineering for review. <br />§1011.012 Inspections and Maintenance <br />This section was previously located in §1011.10; however, for organizational purposes has been moved <br />to §1011.012. No language changes were made in this section other than a few grammatical corrections. <br />§1011.013 Plan Review Procedure <br />This section was previously located in §1011.11; however, for organizational purposes has been moved <br />to §1011.013. No language changes were made. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.