Laserfiche WebLink
in order to construct, operate or maintain the Project shall be <br />acquired by Lino Lakes at its sole cost before construction of the <br />Project. <br />4. Ownership of Project. Pipes, meters, and appurtenances installed <br />as part of the Project shall be owned by Lino Lakes. <br />B. Maintenance. Except as herein provided, Lino Lakes shall be responsible <br />for maintenance of any water mains within Lino Lakes that connect to the <br />Project. Lino Lakes shall maintain the water mains which connect to the <br />Project in good working order and in accordance with the American <br />Waterworks Association Standards for Water Mains. All repair and <br />maintenance shall be completed within a reasonable time. <br />C. Defects/Emergencies. Lino Lakes shall report to the Shoreview Director <br />of Public Works any defects which occur in the Lino Lakes Water Main <br />System. Lino Lakes shall have an on-call contractor available on a 24- <br />hour basis for repair of its water main system. The Shoreview Director of <br />Public Works may designate any defect as requiring an emergency repair <br />if it will have significant impact on the use of the Shoreview Water Utility <br />System by Shoreview residents or, if the defect will result in unmonitored <br />use of the Shoreview Water Utility System. In the event of an emergency, <br />repair procedures shall be undertaken as soon as reasonably possible, but <br />nothing herein shall prevent Shoreview from taking appropriate steps to <br />protect the security of the Shoreview Water Utility System and the health, <br />safety and welfare of Shoreview residents. All repair and maintenance <br />shall be completed within a reasonable time. <br />D. Use Charges. Lino Lakes shall pay Shoreview all water utility fees <br />required by the Shoreview City Code, City resolutions and amendments <br />thereto. The specific water use rate applicable to Lino Lakes shall be <br />equal to Shoreview's middle tier rate plus 25%. The connecting meter <br />shall be read by Shoreview personnel. A statement for the total water <br />provided during the month, as determined by the Shoreview Director of <br />Public Works, shall be mailed to Lino Lakes within a reasonable time after <br />the last day of each month. Statements shall be due and payable within <br />thirty (30) days of receipt. <br />E. Shoreview Code and Regulations. Lino Lakes shall comply with the <br />provisions of the Shoreview City Code relating to its Water Utility System <br />and any amendments thereto. All Shoreview codes and resolutions <br />referred to in this Agreement are hereby incorporated. Nothing herein <br />shall be construed to limit the authority of Shoreview to adopt or amend <br />its ordinances or resolutions. <br />