Laserfiche WebLink
a.m. and no later than 8:00 p.m. anywhere on the site on any day. This applies to the <br />conditional use permit on the entire site and the interim use permit on the northern <br />portion. <br />14. a. The new landscaping plan dated received by the City October 10, 2001 shall be the <br />approved plan with the addition of plantings described in 14.b. All plantings shall be <br />in place by June 2002. Plantings shall be maintained in a healthy state. Dead <br />plantings shall be replaced in a timely manner. This condition applies to the overall <br />conditional use permit on the entire site for the concrete plant as well as the interim <br />use permit for storage in the northern portion of the site. <br />b. A double row of staggered conifers shall be planted along the northern Molin <br />property line. They shall be minimum five feet tall when planted. Trees in each row <br />shall be planted 36 feet apart to achieve the effect of a tree every 18 feet when viewed <br />horizontally. (The wetland/pond may necessitate some variation to that pattern, <br />however.) No trees are required to be planted along the western 230 feet. A conifer <br />species with a maximum height of 30 feet shall be planted along the next 420 feet <br />moving east. White or red pines shall be planted along the eastern 640 feet. <br />15. The interim use permit on the northern portion, zoned LI, allows for storage, not <br />production. No production or finishing activities shall be conducted in this area. This <br />includes cutting, grinding, and other such work. <br />16. The interim use permit will expire if there is a change in the land use in the LI District <br />on the northern portion of the site. <br />17. The following conditions that were approved on October 27, 1997 shall no longer <br />apply: <br />-condition 11 a. requiring storing wall panels parallel to the buffer yard (berm); <br />-condition 13 c. requiring a solid row of coniferous trees on the north side of the berm <br />and a row of deciduous trees on the south side of the berm; <br />-condition 13 e. requiring irrigation for the berm. <br />18. The existing outdoor core slab casting bed (outdoor concrete pouring) shall be <br />eliminated as soon as the new extruded precast manufacturing building is completed. <br />This condition shall apply to the site plan and the conditional use permit covering the <br />entire site. <br />