My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-021 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-021 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 1:09:17 PM
Creation date
11/30/2015 12:44:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
economic and natural environmental values of shorelands; and (3) provide for the wise use of <br />water and related land resources of the state. The City ordinance echoes this purpose. <br />7. As stated in the City's shoreland ordinance, placement and design of roads and driveways is <br />to achieve maximum screening from view from public waters, meet structure setbacks, and <br />avoid shore impact zones or minimize adverse impacts if placed in the impact zone. <br />8. The project will require considerable clearing of trees and other vegetation for a bridge, an <br />access road, house pads, and stormwater management facilities in the shore impact zone and <br />elsewhere on the site. <br />9. The project will require the construction of a bridge of approximately 300 feet in length. The <br />City will need definitive information describing the bridge type, materials, soils, and <br />construction methods. The City must assess the potential impacts of the bridge on wetlands, <br />public waters, other elements of the natural environmental as well as on existing residential <br />development. <br />10. The Rice Creek Watershed District (RCWD) has jurisdiction to review the grading, drainage, <br />and wetland impacts of the project. The RCWD review of September 26, 2001 notes the <br />need for additional information on: bridge construction plans and specifications including <br />erosion and sediment control; verification of wetland boundaries; floodplain fill and <br />compensatory storage; and other issues. <br />11. The Lino Lakes Planning & Zoning Board conducted a public hearing on the project on <br />January 9, 2002. <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that, <br />because of its nature and the location, the project may have the potential for significant <br />environmental effects. <br />BE IT FURTHER RESOLVED that an Environmental Assessment Worksheet is needed and <br />shall be prepared according to MN Rules 4410. <br />BE IT FURTHER RESOLVED that the project proposer shall submit a cash escrow to cover <br />the anticipated cost of City staff review, revision, and administration of the EAW. <br />v"\ <br />Adopted by the Lino Lakes City Council this — day of 'yYv,L,rc f\ , 2002. <br />ATTEST: <br />Ann Blair, CiClerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.