Laserfiche WebLink
ESTIMATE NO. 6 (FINAL) 12 -Nov -01 <br />21ST AVENUE LIFT STATION AND FORCEMAIN IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />:,OMMISSION NO. 11473-04 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />SANITARY SEWER <br />1 MOBILIZATION LS 1.00 1.00 $ 10,000.00 $ 10,000.00 <br />2 CLEARING AC 0.40 0.40 $ 8,000.00 $ 3,200.00 <br />3 GRUBBING AC 0.40 0.40 $ 8,000.00 $ 3,200.00 <br />4 CONN TO EXISTING SANITARY SEWER EA 1.00 1.00 $ 1,000.00 $ 1,000.00 <br />5 CONN TO EXISTING SS MANHOLE EA 1.00 1.00 $ 1,000.00 $ 1,000.00 <br />6 6" PVC SDR 26 CL 160 FM (0-10') LF 800.00 959.00 $ 13.00 $ 12,467.00 <br />7 6" PVC SDR 26 CL 160 FM (10-12') LF 142.00 30.00 $ 15.00 $ 450.00 <br />8 6" PVC SDR 26 CL 160 FM (12-14') LF 60.00 10.00 $ 17.00 $ 170.00 <br />9 6" PVC SDR 26 CL 160 FM (14-16') LF 15.00 25.00 $ 19.00 $ 475.00 <br />10 6" PVC SDR 26 CL 160 FM (16-18') LF 45.00 40.00 $ 21.00 $ 840.00 <br />11 12" DIP CL 52 SS FM (0-10') LF 1535.00 1714.00 $ 26.00 $ 44,564.00 <br />12 12" CIP CL 52 SS FM (10-12') LF 560.00 700.00 $ 28.00 $ 19,600.00 <br />13 12" DIP CL 52 SS FM (12-14') LF 380.00 82.00 $ 30.00 $ 2,460.00 <br />14 12" DIP CL 52 SS FM (14-16') LF 45.00 $ 32.00 $ <br />15 21" PVC SDR 35 SS (32-34') LF 53.00 45.00 $ 400.00 $ 18,000.00 <br />16 12" DIP CL 52 SS THRU CAS (EXCL CASING) LF 80.00 80.00 $ 28.00 $ 2,240.00 <br />17 24" STEEL CASING PIPE LF 80.00 80.00 $ 175.00 $ 14,000.00 <br />18 6" PVC SDR 26 SS THRU CAS (EXCL CASING) LF 250.00 250.00 $ 15.00 $ 3,750.00 <br />19 42" STEEL CASING PIPE LF 250.00 250.00 $ 264.00 $ 66,000.00 <br />20 6" INSIDE DROP EA 1.00 1.00 $ 1,500.00 $ 1,500.00 <br />21 TRENCH STABILIZATION ROCK CY 100.00 435.00 $ 20.00 $ 8,700.00 <br />22 SILT FENCE LF 840.00 315.00 $ 2.00 $ 630.00 <br />SUBTOTAL - SANITARY SEWER $ 214,246.00 <br />LIFT STATION <br />1 LIFT STATION <br />SUBTOTAL - LIFT STATION <br />LS <br />1.00 1.00 $ 200,000.00 $ 200,000.00 <br />$ 200,000.00 <br />STORM SEWER <br />1 12" CMP STORM PIPE (SALV & REINSTALL) LF 30.00 30.00 $ 20.00 $ 600.00 <br />2 12" GS APRON (SALV & REINSTALL) EA 2.00 $ 75.00 $ <br />3 CL ii HAND PLACED RIPRAP CY 4.00 $ 70.00 $ <br />SUBTOTAL - STORM SEWER $ 600.00 <br />STREETS & RESTORATION <br />1 SELECT GRANULAR BORROW (Iv) CY 510.00 510.00 $ 10.50 $ 5,355.00 <br />2 GRANULAR BORROW (Iv) CY 940.00 719.00 $ 10.50 $ 7,549.50 <br />3 AGGREGATE BASE CLASS 6 TN 240.00 337.46 $ 10.95 $ 3,695.19 <br />4 2"-2350 TYPE LV MIX #. 4 WEAR COURSE TN 70.00 61.47 $ 70.00 $ 4,302.90 <br />5 2"-2350 TYPE LV MIX #. 3 NON -WEAR COURSE TN 100.00 137.83 $ 65.00 $ 8,958.95 <br />6 BITUMINOUS MATERIAL FOR TACK COAT GA 28.00 28.00 $ 1.50 $ 42.00 <br />7 TOPSOIL BORROW (LV) CY 725.00 $ 5.00 $ <br />8 ROADSIDE SEEDING & SEED MIXTURE AC 3.45 3.50 $ 950.00 $ 3,325.00 <br />9 SOD, TYPE LAWN SY 450.00 663.00 $ 2.75 $ 1,823.25 <br />SUBTOTAL -STREETS & RESTORATION $ 35,051.79 <br />TOTAL ESTIMATE NO. 6 (FINAL) $ 449,897.79 <br />11473-04 <br />