Laserfiche WebLink
JUL-IV-CMG 11:7• <br />SAINT PAUL <br />REGIONAL <br />WATER <br />SERVICES <br />Date: July 10, 2002 <br />H1N1 YHUL WHItX UTILITY 651 292 7811 P.01/02 <br />-7 -10 --zoo .2_ <br />Engineering Division <br />8 4th St E Suite 400 <br />Saint Paul MN 55101 <br />Voice: 651- 266-6270 <br />Fax: 651- 292-7811 <br />FACSIMILE COVER SHEET <br />Total Number of Pages: 2 <br />PLEASE DELIVER TO: FROM: <br />Brian Krystofiak <br />Pioneer Engineering, P.A. <br />Phone: 763-489-2271 <br />Fax: 763-783-1883 <br />Bill Tschida <br />phone: 651-266-6265 <br />REMARKS: <br />Saint Paul Regional Water Services (SPRWS) has reviewed the plans for the Stoneybrook development, <br />as received on July 10, 2002, and has the following comments regarding a future roadway and utility <br />crossing of the Board of Water Commissioners easement at Street B extended: <br />1. The raw water conduit located in the easement area will require protection in the form of an 8 - <br />inch reinforced concrete mat as show on the attached Exhibit "B". <br />2. A driveway access on both sides of the roadway must be provided to retain the ability of <br />SPRWS crews to travel north and south with equipment. <br />3. A removable barrier such as a gated fence must be provided along both sides of the roadway <br />within the easement area to discourage access from the roadway yet allow SPRWS crews to <br />transport equipment over the roadway. <br />4. Utility crossings, as well as plans addressing the above requirements, must be approved in <br />advance of construction. <br />5. A Rider to Agreement between the Board and the City of Lino Lakes granting permission for <br />a crossing and specifying the above and other conditions must be executed prior to <br />construction in the easement area. <br />You can reach me at 651-266-6265 to discuss questions of concerns. <br />_ : Hard copy will follow via U.S. Mall <br />X : Hard copy will not follow via U.S. Mail <br />