My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-078 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-078 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:00:08 PM
Creation date
12/1/2015 8:51:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The developer shall provide the City with a Homeowner's Association <br />agreement including an operation and maintenance agreement for the <br />wetland signage and buffer areas. <br />6. Developer shall prepare a Best Management Practices/Environmental <br />Information brochure with regard to buffer and wetland area requirements. <br />7. The developer shall submit a revised landscaping plan showing proposed <br />landscaping on northeasterly and westerly property lines. <br />8. The developer shall provide a Warranty Deed or otherwise dedicate the <br />Outlots to the City of Lino Lakes. The conveyance of outlots shall not <br />constitute satisfaction of the park dedication requirements. <br />9. The developer shall provide conservation easements covering all proposed <br />wetland buffer areas. <br />10. The developer shall provide dedicated right-of-way or permanent <br />easements covering all proposed temporary cul-de-sacs. <br />11. The Developer shall provide signage identifying wetlands and wetland <br />buffer areas. <br />12. The Developer shall install signage at the end of temporary cul-de-sacs <br />indicating the future extension of such streets. <br />13. A phasing plan shall be implemented. Phase 1 development shall be <br />limited to fifty-two (52) lots in 2002. Phase II development will consist of <br />the remaining lots in 2003. Nothing herein shall prevent the grading of the <br />entire site in one phase. <br />14. All modifications as required by the City Engineer shall be satisfied. <br />15. All required improvements of Birch Street (CSAH 10), as set forth by <br />Anoka County, shall be the responsibility of the developer. <br />16. All federal, state, county, and watershed district permits shall be obtained <br />prior to commencement of site improvements. <br />17. The developer shall enter into a Development Agreement with the City <br />prior to commencement of site improvements. <br />Adopted by the Lino Lakes City Council this 26th day of August, 2002 <br />Jot fJ. Bergeson, Mayor <br />ATTEST: <br />Ann Blair, Citylerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.