My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-079 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-079 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 3:58:44 PM
Creation date
12/1/2015 8:56:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
07/22/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7B <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: July 22, 2002 <br />TOPIC: Resolution No. 02 - 79, Approving Preparation of Plans and Authorizing <br />Advertisement for Bids for Well No. 4 Booster Pumping Station <br />Vote Required: Simple Majority <br />BACKGROUND: <br />In 1996, Well Pumphouse No. 4 was installed and in 1997, the elevated tank was <br />constructed. A 16" water main trunk connects these infrastructures to the Clearwater <br />Creek subdivision and the rest of the city water system. Over the past years, the service <br />area continues to be connected to and water use continues to increase. The water <br />pressure varies throughout the city with the Clearwater Creek area having the lowest <br />average pressure. The Clearwater Creek area is at some of the highest city ground <br />elevations and average use continues to increase with the new homes that are <br />constructed. The water system will be improved to achieve the typical water pressures <br />that are experienced in the rest of the city. This will be done using a booster pumping <br />station at Well Pumphouse No. 4. This improvement can be easily implemented in this <br />isolated area. <br />The schedule for this project is as follows: <br />City Council Approves Plans and Specifications <br />City Council Authorizes Advertisement for bids <br />Open Bids <br />City Council Awards Contract <br />Construction Begins <br />July 22, 2002 <br />July 22, 2002 <br />August 22, 2002 <br />August 26, 2002 <br />September 2002 <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 02 - 79, approving plans & specifications and <br />authorizing advertisement for bids for Well No. 4 Booster Pumping station. <br />3. Not adopt Resolution Number 02 — 79. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution Number 02 - 79 be adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.