Laserfiche WebLink
AGENDA ITEM 7B <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: July 22, 2002 <br />TOPIC: Resolution No. 02 - 79, Approving Preparation of Plans and Authorizing <br />Advertisement for Bids for Well No. 4 Booster Pumping Station <br />Vote Required: Simple Majority <br />BACKGROUND: <br />In 1996, Well Pumphouse No. 4 was installed and in 1997, the elevated tank was <br />constructed. A 16" water main trunk connects these infrastructures to the Clearwater <br />Creek subdivision and the rest of the city water system. Over the past years, the service <br />area continues to be connected to and water use continues to increase. The water <br />pressure varies throughout the city with the Clearwater Creek area having the lowest <br />average pressure. The Clearwater Creek area is at some of the highest city ground <br />elevations and average use continues to increase with the new homes that are <br />constructed. The water system will be improved to achieve the typical water pressures <br />that are experienced in the rest of the city. This will be done using a booster pumping <br />station at Well Pumphouse No. 4. This improvement can be easily implemented in this <br />isolated area. <br />The schedule for this project is as follows: <br />City Council Approves Plans and Specifications <br />City Council Authorizes Advertisement for bids <br />Open Bids <br />City Council Awards Contract <br />Construction Begins <br />July 22, 2002 <br />July 22, 2002 <br />August 22, 2002 <br />August 26, 2002 <br />September 2002 <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 02 - 79, approving plans & specifications and <br />authorizing advertisement for bids for Well No. 4 Booster Pumping station. <br />3. Not adopt Resolution Number 02 — 79. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution Number 02 - 79 be adopted. <br />