Laserfiche WebLink
ESTIMATE NO. 2 (Final) <br />77TH STREET UTILITY EXTENSION <br />CTY OF LINO LAKES TOLTZ, KING, DUVALL, ANDERSON <br />h,.___) LAKES, MINNESOTA AND ASSOCIATES, INCORPORATED <br />ENGINEERS-ARCHITECTS-PLANNERS <br />COMMISSION NO. 10414-99A <br />ITEM CONTRACT QUANTITY UNIT <br />NO. DESCRIPTION QUANTITY UNIT TO DATE PRICE AMOUNT <br />SANITARY SEWER <br />1 <br />MOBILIZATION <br />1.00 <br />LS <br />1.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />2 <br />CONNECT TO EXISTING SANITARY SEWER <br />1.00 <br />EA <br />1.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />3 <br />10" PVC, C-900 SANITARY SEWER <br />551.00 <br />LF <br />', 551.00 <br />$ 26.00 <br />$ 14,326.00 <br />4 <br />CONSTRUCT 4' DIA. MH <br />4.00 <br />EA 4.00 <br />$ 1,400.00 <br />$ 5,600.00 <br />5 1 EXTRA DEPTH OF 4' DIA. MH <br />5.30 <br />LF 5.30 <br />$ 100.00 <br />$ 530.00 <br />6 4" ON 10" PVC, C-900 WYE BRANCH <br />5.00 <br />EA 5.00 <br />$ 450.00 <br />$ 2,250.00 <br />7 6" ON 10" PVC, C-900 WYE BRANCH <br />1.00 <br />EA <br />3.00 <br />$ 500.00 <br />$ 1,500.00 <br />8 4" PVC, C-900 SERVICE PIPE <br />115.00 <br />LF <br />113.00 <br />$ 15.00 <br />$ 1,695.00 <br />9 16" PVC, C-900 SERVICE PIPE <br />18.00 <br />LF <br />1 44.00 <br />$ 25.00 <br />$ 1,100.00 <br />10 TELEVISE SANITARY SEWER MAINS <br />551.00 <br />LF <br />551.00 <br />$ 1.00 <br />$ 551.00 <br />SUBTOTAL - SANITARY SEWER <br />$ 31,552.00 <br />WATERMAIN <br />1 CONNECT TO EXISTING WATERMAIN <br />1.00 <br />EA <br />1.00 <br />$ 550.00 <br />$ 550.00 <br />2 6" DIP, CL. 52 WATERMAIN <br />28.00 LF <br />58.00 <br />$ 25.00 <br />$ 1,450.00 <br />3 18" DIP, CL. 52 WATERMAIN <br />545.001 LF <br />545.00 <br />$ 22.00 1 <br />$ 11,990.00 <br />' 6" RES. SEAT GATE VALVE & BOX <br />2.00 EA <br />' 4.00 <br />$ 500.00 1 <br />$ 2,000.00 <br />_ <br />8" RES. SEAT GATE VALVE & BOX <br />1.00 EA <br />1.00 <br />$ 600.00 1 <br />$ 600.00 <br />6 6" HYDRANT <br />1.00 EA <br />1.00 <br />$ 1,300.00 <br />$ 1,300.00 <br />7 1" TYPE "K" WATER SERVICE <br />100.00 LF <br />99.00 <br />$ 7.00 1 <br />$ 693.00 <br />8 1" CORPORATION STOP <br />5.00 EA <br />5.00 <br />$ 75.00 <br />$ 375.00 <br />9 1" CURB STOP & BOX <br />5.00 <br />EA <br />5.00 <br />$ 75.00 <br />$ 375.00 <br />10 MJ FITTINGS <br />335.00 <br />LB <br />335.00 <br />$ 4.00 <br />$ 1,340.00 <br />SUBTOTAL - WATERMAIN <br />$ 20,673.00 <br />STREETS & RESTORATION <br />1 REMOVE & DISPOSE BIT. SURFACE <br />1380.00 <br />SY <br />1300.001 $ 3.00 <br />$ 3,900.00 <br />2 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />143.00 <br />LF <br />110.00 <br />$ 3.00 <br />1 $ 330.00 <br />3 1 1/2"-2350 TYPE LV 4 WEARING COURSE <br />150.00 <br />TN <br />110.00 <br />$ 42.00 <br />$ 4,620.00 <br />4 12"-2350 TYPE LV 3 NON-WEARING COURSE <br />200.00 <br />TN <br />150.00 <br />$ 40.00 <br />$ 6,000.00 <br />5 5" AGGREGATE BASE, CLASS 5 <br />530.00 <br />TN <br />447.27 <br />$ 14.00 <br />$ 6,261.78 <br />6 BIT. MATERIAL FOR TACK COAT <br />70.00 <br />GA <br />65.00 $ 3.00 <br />1 $ 195.00 <br />7 ;TOPSOIL 4" DEPTH <br />220.00 <br />CY <br />144.00 $ 10.00 <br />$ 1,440.00 <br />8 SODDING <br />1400.00 <br />SY <br />1124.001 $ 3.00 <br />$ 3,372.00 <br />SUBTOTAL - STREETS & RESTORATION <br />$ 26,118.78 <br />TOTAL <br />$ 78,343.78 <br />Page 1 <br />