Laserfiche WebLink
S.ts. WEIDEMA INC. NODLAND CONSTRUCTION CO. RICHARD KNUTSON INC. <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />STORM SEWER <br />1 <br />REMOVE 24" CMP STORM PIPE <br />60.0 <br />LF <br />$ 8.65 <br />$ 519.00 <br />$ 10.00 <br />$ 600.00 <br />$ 5.00 <br />$ 300.00 <br />2 <br />REMOVE SIDE INLET CATCH BASIN <br />2.0 <br />EA <br />$ 145.00 <br />$ 290.00 <br />$ 300.00 <br />$ 600.00 <br />$ 250.00 <br />$ 500.00 <br />3 <br />15" RCP, CL.5 STORM SEWER PIPE <br />51.0 <br />LF <br />$ 20.65 <br />$ 1,053.15 <br />$ 25.00 <br />$ 1,275.00 <br />$ 24.35 <br />$ 1,241.85 <br />4 <br />15" RC FLARED END W/TRASH GUARD <br />1.0 <br />EA <br />$ 675.00 <br />$ 675.00 <br />$ 800.00 <br />$ 800.00 <br />$ 507.75 <br />$ 507.75 <br />5 <br />CURB OPENING CATCH BASIN <br />1.0 <br />EA <br />$ 1,240.00 <br />$ 1,240.00 <br />$ 1,050.00 <br />$ 1,050.00 <br />$ 1,145.00 <br />$ 1,145.00 <br />6 <br />CONCRETE SPILLWAY <br />1.0 <br />EA <br />$ 475.00 <br />$ 475.00 <br />$ 350.00 <br />$ 350.00 <br />$ 365.00 <br />$ 365.00 <br />7 <br />CLASS 3 HAND PLACED RIP RAP <br />9.0 <br />CY <br />$ 75.00 <br />$ 675.00 <br />$ 50.00 <br />$ 450.00 <br />$ 60.00 <br />$ 540.00 <br />8 <br />GEOTEXTILE FABRIC <br />6.0 <br />SY <br />$ 8.00 <br />$ 48.00 <br />$ 25.00 <br />$ 150.00 <br />$ 10.00 <br />$ 60.00 <br />SUBTOTAL - STORM SEWER <br />$ 4,975.15 <br />$ 5,275.00 <br />$ 4,659.60 <br />STREETS & RESTORATION <br />1 <br />REMOVE BITUMINOUS PAVEMENT <br />3700.0 <br />SY <br />$ 0.63 <br />$ 2,331.00 <br />$ 1.00 <br />$ 3,700.00 <br />$ 1.50 <br />$ 5,550.00 <br />2 <br />SAWCUT BIT. PAVEMENT (FULL DEPTH) <br />30.0 <br />LF <br />$ 3.15 <br />$ 94.50 <br />$ 3.00 <br />$ 90.00 <br />$ 4.00 <br />$ 120.00 <br />3 <br />SUBGRADE PREPARATION <br />9.7 <br />RS <br />$ 220.00 <br />$ 2,134.00 <br />$ 175.00 <br />$ 1,697.50 <br />$ 150.00 <br />$ 1,455.00 <br />4 <br />COMMON EXCAVATION (CV) (P) <br />1330.0 <br />CY <br />$ 6.70 <br />$ 8,911.00 <br />$ 4.00 <br />$ 5,320.00 <br />$ 6.00 <br />$ 7,980.00 <br />5 <br />D412 CONC. CURB & GUTTER <br />1940.0 <br />LF <br />$ 6.72 <br />$ 13,036.80 <br />$ 6.50 <br />$ 12,610.00 <br />$ 5.90 <br />$ 11,446.00 <br />6 <br />AGGREGATE BASE CLASS 5 <br />1250.0 <br />TN <br />$ 10.15 <br />$ 12,687.50 <br />$ 8.50 <br />$ 10,625.00 <br />$ 10.88 <br />$ 13,600.00 <br />7 <br />2350 TYPE LV 2 OR 3 NON WEAR. COURSE <br />375.0 <br />TN <br />$ 32.55 <br />$ 12,206.25 <br />$ 34.00 <br />$ 12,750.00 <br />$ 33.92 <br />$ 12,720.00 <br />8 <br />2350 TYPE LV 4 WEARING COURSE <br />315.0 <br />TN <br />$ 40.40 <br />$ 12,726.00 <br />$ 40.00 <br />$ 12,600.00 <br />$ 41.21 <br />$ 12,981.15 <br />9 <br />CRS-1 BITUMINOUS MATERIAL FOR TACK <br />155.0 <br />GA <br />$ 1.40 <br />$ 217.00 <br />$ 1.00 <br />$ 155.00 <br />$ 1.28 <br />$ 198.40 <br />10 <br />TOPSOIL BORROW <br />210.0 <br />CY <br />$ 7.60 <br />$ 1,596.00 <br />$ 3.00 <br />$ 630.00 <br />$ 9.50 <br />$ 1,995.00 <br />11 <br />SODDING <br />3450.0 <br />SY <br />$ 1.90 <br />$ 6,555.00 <br />$ 1.80 <br />$ 6,210.00 <br />$ 2.55 <br />$ 8,797.50 <br />12 <br />SILT FENCE <br />100.0 <br />LF <br />$ 4.20 <br />$ 420.00 <br />$ 1.50 <br />$ 150.00 <br />$ 4.50 <br />$ 450.00 <br />13 <br />WASHED ROCK FOR ROCK ENTRANCE <br />20.0 <br />CY <br />$ 31.50 <br />$ 630.00 <br />$ 30.00 <br />$ 600.00 <br />$ 30.00 <br />$ 600.00 <br />SUBTOTAL - STREETS AND RESTORATION <br />$ 73,545.05 <br />$ 67,137.50 <br />$ 77,893.05 <br />TOTAL ALTERNATE BID <br />$ 144,814.95 <br />$ 141,126.50 <br />$ 145,978.85 <br />GRAND TOTAL BID <br />$ 415,184.35 <br />$ 413,781.50 <br />$ 421,521.78 <br />* <br />BID TABULATION Page 9 <br />