S.ts. WEIDEMA INC. NODLAND CONSTRUCTION CO. RICHARD KNUTSON INC.
<br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br />STORM SEWER
<br />1
<br />REMOVE 24" CMP STORM PIPE
<br />60.0
<br />LF
<br />$ 8.65
<br />$ 519.00
<br />$ 10.00
<br />$ 600.00
<br />$ 5.00
<br />$ 300.00
<br />2
<br />REMOVE SIDE INLET CATCH BASIN
<br />2.0
<br />EA
<br />$ 145.00
<br />$ 290.00
<br />$ 300.00
<br />$ 600.00
<br />$ 250.00
<br />$ 500.00
<br />3
<br />15" RCP, CL.5 STORM SEWER PIPE
<br />51.0
<br />LF
<br />$ 20.65
<br />$ 1,053.15
<br />$ 25.00
<br />$ 1,275.00
<br />$ 24.35
<br />$ 1,241.85
<br />4
<br />15" RC FLARED END W/TRASH GUARD
<br />1.0
<br />EA
<br />$ 675.00
<br />$ 675.00
<br />$ 800.00
<br />$ 800.00
<br />$ 507.75
<br />$ 507.75
<br />5
<br />CURB OPENING CATCH BASIN
<br />1.0
<br />EA
<br />$ 1,240.00
<br />$ 1,240.00
<br />$ 1,050.00
<br />$ 1,050.00
<br />$ 1,145.00
<br />$ 1,145.00
<br />6
<br />CONCRETE SPILLWAY
<br />1.0
<br />EA
<br />$ 475.00
<br />$ 475.00
<br />$ 350.00
<br />$ 350.00
<br />$ 365.00
<br />$ 365.00
<br />7
<br />CLASS 3 HAND PLACED RIP RAP
<br />9.0
<br />CY
<br />$ 75.00
<br />$ 675.00
<br />$ 50.00
<br />$ 450.00
<br />$ 60.00
<br />$ 540.00
<br />8
<br />GEOTEXTILE FABRIC
<br />6.0
<br />SY
<br />$ 8.00
<br />$ 48.00
<br />$ 25.00
<br />$ 150.00
<br />$ 10.00
<br />$ 60.00
<br />SUBTOTAL - STORM SEWER
<br />$ 4,975.15
<br />$ 5,275.00
<br />$ 4,659.60
<br />STREETS & RESTORATION
<br />1
<br />REMOVE BITUMINOUS PAVEMENT
<br />3700.0
<br />SY
<br />$ 0.63
<br />$ 2,331.00
<br />$ 1.00
<br />$ 3,700.00
<br />$ 1.50
<br />$ 5,550.00
<br />2
<br />SAWCUT BIT. PAVEMENT (FULL DEPTH)
<br />30.0
<br />LF
<br />$ 3.15
<br />$ 94.50
<br />$ 3.00
<br />$ 90.00
<br />$ 4.00
<br />$ 120.00
<br />3
<br />SUBGRADE PREPARATION
<br />9.7
<br />RS
<br />$ 220.00
<br />$ 2,134.00
<br />$ 175.00
<br />$ 1,697.50
<br />$ 150.00
<br />$ 1,455.00
<br />4
<br />COMMON EXCAVATION (CV) (P)
<br />1330.0
<br />CY
<br />$ 6.70
<br />$ 8,911.00
<br />$ 4.00
<br />$ 5,320.00
<br />$ 6.00
<br />$ 7,980.00
<br />5
<br />D412 CONC. CURB & GUTTER
<br />1940.0
<br />LF
<br />$ 6.72
<br />$ 13,036.80
<br />$ 6.50
<br />$ 12,610.00
<br />$ 5.90
<br />$ 11,446.00
<br />6
<br />AGGREGATE BASE CLASS 5
<br />1250.0
<br />TN
<br />$ 10.15
<br />$ 12,687.50
<br />$ 8.50
<br />$ 10,625.00
<br />$ 10.88
<br />$ 13,600.00
<br />7
<br />2350 TYPE LV 2 OR 3 NON WEAR. COURSE
<br />375.0
<br />TN
<br />$ 32.55
<br />$ 12,206.25
<br />$ 34.00
<br />$ 12,750.00
<br />$ 33.92
<br />$ 12,720.00
<br />8
<br />2350 TYPE LV 4 WEARING COURSE
<br />315.0
<br />TN
<br />$ 40.40
<br />$ 12,726.00
<br />$ 40.00
<br />$ 12,600.00
<br />$ 41.21
<br />$ 12,981.15
<br />9
<br />CRS-1 BITUMINOUS MATERIAL FOR TACK
<br />155.0
<br />GA
<br />$ 1.40
<br />$ 217.00
<br />$ 1.00
<br />$ 155.00
<br />$ 1.28
<br />$ 198.40
<br />10
<br />TOPSOIL BORROW
<br />210.0
<br />CY
<br />$ 7.60
<br />$ 1,596.00
<br />$ 3.00
<br />$ 630.00
<br />$ 9.50
<br />$ 1,995.00
<br />11
<br />SODDING
<br />3450.0
<br />SY
<br />$ 1.90
<br />$ 6,555.00
<br />$ 1.80
<br />$ 6,210.00
<br />$ 2.55
<br />$ 8,797.50
<br />12
<br />SILT FENCE
<br />100.0
<br />LF
<br />$ 4.20
<br />$ 420.00
<br />$ 1.50
<br />$ 150.00
<br />$ 4.50
<br />$ 450.00
<br />13
<br />WASHED ROCK FOR ROCK ENTRANCE
<br />20.0
<br />CY
<br />$ 31.50
<br />$ 630.00
<br />$ 30.00
<br />$ 600.00
<br />$ 30.00
<br />$ 600.00
<br />SUBTOTAL - STREETS AND RESTORATION
<br />$ 73,545.05
<br />$ 67,137.50
<br />$ 77,893.05
<br />TOTAL ALTERNATE BID
<br />$ 144,814.95
<br />$ 141,126.50
<br />$ 145,978.85
<br />GRAND TOTAL BID
<br />$ 415,184.35
<br />$ 413,781.50
<br />$ 421,521.78
<br />*
<br />BID TABULATION Page 9
<br />
|