Laserfiche WebLink
ENGINEER'S ESTIMATE C.W. HOULE INC. W.B. MILLER INC. <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />STREETS & RESTORATION <br />1 <br />REMOVE CONCRETE DRIVEWAY <br />100.0 <br />SY <br />$ 5.00 <br />$ 500.00 <br />$ 5.50 <br />$ 550.00 <br />$ 4.10 <br />$ 410.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />6000.0 <br />SY <br />$ 3.00 <br />$ 18,000.00 <br />$ 1.32 <br />$ 7,920.00 <br />$ 2.40 <br />$ 14,400.00 <br />3 <br />SAWCUT BIT. PAVEMENT (FULL DEPTH) <br />110.0 <br />LF <br />$ 3.00 <br />$ 330.00 <br />$ 5.50 <br />$ 605.00 <br />$ 3.60 <br />$ 396.00 <br />4 <br />SUBGRADE PREPARATION <br />18.2 <br />RS <br />$ 100.00 <br />$ 1,820.00 <br />$ 120.00 <br />$ 2,184.00 <br />$ 205.00 <br />$ 3,731.00 <br />6 <br />COMMON EXCAVATION (CV) (P) <br />1570.0 <br />CY <br />$ 2.50 <br />$ 3,925.00 <br />$ 6.50 <br />$ 10,205.00 <br />$ 4.75 <br />$ 7,457.50 <br />7 <br />D412 CONC. CURB & GUTTER <br />3600.0 <br />LF <br />$ 6.50 <br />$ 23,400.00 <br />$ 6.25 <br />$ 22,500.00 <br />$ 6.45 <br />$ 23,220.00 <br />8 <br />VALLEY GUTTER <br />1.0 <br />LF <br />$ 6.50 <br />$ 6.50 <br />$ 1,250.00 <br />$ 1,250.00 <br />$ 1,250.00 <br />$ 1,250.00 <br />9 <br />AGGREGATE BASE CLASS 5 <br />2546.0 <br />TN <br />$ 9.00 <br />$ 22,914.00 <br />$ 7.00 <br />$ 17,822.00 <br />$ 7.90 <br />$ 20,113.40 <br />10 <br />2350 TYPE LV 2 OR 3 NON WEAR. COURSE <br />705.0 <br />TN <br />$ 32.00 <br />$ 22,560.00 <br />$ 31.30 <br />$ 22,066.50 <br />$ 32.25 <br />$ 22,736.25 <br />11 <br />2350 TYPE LV 4 WEARING COURSE <br />625.0 <br />TN <br />$ 32.00 <br />$ 20,000.00 <br />$ 35.30 <br />$ 22,062.50 <br />$ 37.00 <br />$ 23,125.00 <br />12 <br />CRS-1 BITUMINOUS MATERIAL FOR TACK <br />290.0 <br />GA <br />$ 2.00 <br />$ 580.00 <br />$ 1.45 <br />$ 420.50 <br />$ 1.00 <br />$ 290.00 <br />13 <br />6' CONCRETE DRIVE <br />120.0 <br />SY <br />$ 25.00 <br />$ 3,000.00 <br />$ 28.25 <br />$ 3,390.00 <br />$ 28.60 <br />$ 3,432.00 <br />14 <br />TOPSOIL BORROW <br />370.0 <br />CY <br />$ 10.00 <br />$ 3,700.00 <br />$ 6.50 <br />$ 2,405.00 <br />$ 7.25 <br />$ 2,682.50 <br />15 <br />SODDING <br />6410.0 <br />SY <br />$ 2.50 <br />$ 16,025.00 <br />$ 1.75 <br />$ 11,217.50 <br />$ 2.55 <br />$ 16,345.50 <br />16 <br />SILT FENCE <br />50.0 <br />LF <br />$ 2.00 <br />$ 100.00 <br />$ 4.00 <br />$ 200.00 <br />$ 5.15 <br />$ 257.50 <br />17 <br />WASHED ROCK FOR ROCK ENTRANCE <br />10.0 <br />CY <br />$ 20.00 <br />$ 200.00 <br />$ 23.00 <br />$ 230.00 <br />$ 15.40 <br />$ 154.00 <br />SUBTOTAL - STREETS AND RESTORATION <br />$ 137,060.50 <br />$ 125,028.00 <br />$ 140,000.65 <br />TOTAL BID <br />$ 265,417.50 <br />$ 234,468.00 <br />' <br />$ 255,229.15 <br />* <br />ALTERNATE BID - TWILIGHT ACRES 2ND <br />SANITARY SEWER <br />1 <br />8" PVC, SDR 35 SAN. SEW. (10'-12' DEEP) <br />745.0 <br />LF <br />$ 17.00 <br />$ 12,665.00 <br />$ 17.10 <br />$ 12,739.50 <br />$ 15.40 <br />$ 11,473.00 <br />2 <br />8' PVC, SDR 35 SAN. SEW. (12'-14' DEEP) <br />75.0 <br />LF <br />$ 19.00 <br />$ 1,425.00 <br />$ 17.10 <br />$ 1,282.50 <br />$ 16.65 <br />$ 1,248.75 <br />3 <br />8' PVC, SDR 35 SAN. SEW. (14'-16' DEEP) <br />94.0 <br />LF <br />$ 21.00 <br />$ 1,974.00 <br />$ 19.10 <br />$ 1,795.40 <br />$ 19.25 <br />$ 1,809.50 <br />4 <br />CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) <br />5.0 <br />EA <br />$ 1,500.00 <br />$ 7,500.00 <br />$ 1,635.00 <br />$ 8,175.00 <br />$ 1,860.00 <br />$ 9,300.00 <br />5 <br />EXTRA DEPTH OF 4' DIA. MH <br />10.3 <br />LF <br />$ 100.00 <br />$ 1,030.00 <br />$ 81.00 <br />$ 834.30 <br />$ 89.00 <br />$ 916.70 <br />6 <br />4" ON 8' PVC, SDR 35 WYE BRANCH <br />6.0 <br />EA <br />$ 50.00 <br />$ 300.00 <br />$ 40.00 <br />$ 240.00 <br />$ 37.00 <br />$ 222.00 <br />7 <br />4" PVC, SDR 26 SAN. SEW. SERVICE PIPE <br />140.0 <br />LF <br />$ 7.00 <br />$ 980.00 <br />$ 7.40 <br />$ 1,036.00 <br />$ 11.25 <br />$ 1,575.00 <br />8 <br />TRENCH STABILIZATION ROCK <br />100.0 <br />CY <br />$ 25.00 <br />$ 2,500.00 <br />$ 0.01 <br />$ 1.00 <br />$ 3.35 <br />$ 335.00 <br />9 <br />TELEVISE SANITARY SEWER MAINS <br />920.0 <br />LF <br />$ 1.00 <br />$ 920.00 <br />$ 0.65 <br />$ 598.00 <br />$ 0.60 <br />$ 552.00 <br />SUBTOTAL - SANITARY SEWER <br />$ 29,294.00 <br />$ 26,701.70 <br />$ 27,431.95 <br />WATERMAIN <br />1 <br />CONNECT TO EXISTING WATERMAIN <br />1.0 <br />EA <br />$ 600.00 <br />$ 600.00 <br />$ 775.00 <br />$ 775.00 <br />$ 360.00 <br />$ 360.00 <br />2 <br />6" DIP CLASS 52 WATERMAIN <br />10.0 <br />LF <br />$ 16.00 <br />$ 160.00 <br />$ 15.50 <br />$ 155.00 <br />$ 13.95 <br />$ 139.50 <br />3 <br />8" DIP CLASS 52 WATERMAIN <br />920.0 <br />LF <br />$ 25.00 <br />$ 23,000.00 <br />$ 17.40 <br />$ 16,008.00 <br />$ 16.30 <br />$ 14,996.00 <br />4 <br />6' RES. SEAT GATE VALVE AND BOX <br />2.0 <br />EA <br />$ 500.00 <br />$ 1,000.00 <br />$ 510.00 <br />$ 1,020.00 <br />$ 410.00 <br />$ 820.00 <br />5 <br />8" RES. SEAT GATE VALVE AND BOX <br />1.0 <br />EA <br />$ 600.00 <br />$ 600.00 <br />$ 685.00 <br />$ 685.00 <br />$ 570.00 <br />$ 570.00 <br />6 <br />6" MJ HUB HYDRANT <br />2.0 <br />EA <br />$ 1,600.00 <br />$ 3,200.00 <br />$ 1,310.00 <br />$ 2,620.00 <br />$ 1,575.00 <br />$ 3,150.00 <br />7 <br />1" TYPE "K' COPPER WATER SERVICE <br />140.0 <br />LF <br />$ 12.00 <br />$ 1,680.00 <br />$ 8.00 <br />$ 1,120.00 <br />$ 11.85 <br />$ 1,659.00 <br />8 <br />1" CORPORATION STOP <br />6.0 <br />EA <br />$ 75.00 <br />$ 450.00 <br />$ 35.00 <br />$ 210.00 <br />$ 15.40 <br />$ 92.40 <br />9 <br />1" CURB STOP & BOX <br />6.0 <br />EA <br />$ 100.00 <br />$ 600.00 <br />$ 78.00 <br />$ 468.00 <br />$ 60.50 <br />$ 363.00 <br />10 <br />DIP FITTINGS <br />360.0 <br />LB <br />$ 3.00 <br />$ 1,080.00 <br />$ 3.10 <br />$ 1,116.00 <br />$ 3.05 <br />$ 1,098.00 <br />SUBTOTAL - WATERMAIN <br />$ 32,370.00 <br />$ 24,177.00 <br />$ 23,247.90 <br />BID TABULATION <br />Page 2 <br />