Laserfiche WebLink
B. The total of all estimated prices will be determined as the sum of the products of the <br />estimated quantity of each Bid Item and the Bid Unit Price Bid for the Bid Item. The final <br />quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the <br />General Conditions. <br />C. Discrepancies between the multiplication of units of work and Bid Unit Prices will be resolved <br />in favor of the Bid Unit Prices. Discrepancies between the indicated sum of any column of <br />figures and the correct sum thereof will be resolved in favor of the correct sum. <br />Discrepancies between words and figures will be resolved in favor of the words. <br />D. Bids will be compared on the basis of the "Total Base Bid" and this amount will be the basis <br />for determining the lowest Bidder. <br />14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on <br />account of cash allowances, if any, named in the Contract Documents as provided in <br />Paragraph 11.02 of the General Conditions. <br />ARTICLE 15 - SUBMITTAL OF BID <br />15.01 Bid shall be submitted no later than the date and time prescribed and at the place indicated in <br />the Advertisement or Invitation for Bids and shall be enclosed in a plainly marked package with <br />the Project title (and, if applicable, the designated portion of the Project for which the Bid is <br />submitted), the name and address of Bidder, and shall be accompanied by the Bid Security and <br />other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope <br />containing the Bid shall be enclosed in a separate package plainly marked on the outside with <br />the notation "BID ENCLOSED." A mailed Bid shall be addressed to Owner's office. <br />15.02 The Bid shall include the entire Document 00 41 10, Bid Form. This includes all attachments listed <br />in Article 7.01 of the Bid Form and/or all forms included with the Bid Form. The Contractor may <br />remove or copy these sheets from the Project Manual. <br />15.03 The entire Project Manual should not be submitted with the Bid. <br />ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID <br />16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner <br />that a Bid must be executed and delivered to the place where Bids are to be submitted prior to <br />the date and time for the opening of Bids. <br />16.02 Bids may be withdrawn after Bid Opening only in accordance with the law. <br />ARTICLE 17 - OPENING OF BIDS <br />17.01 Bids will be opened at the time and place indicated in the Advertisement for Bids and unless <br />obviously non-responsive, read aloud publicly. An abstract of the amounts of the Base Bids and <br />major Alternates, if any, will be made available to Bidders after the Project is awarded. <br />ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE <br />18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but <br />Owner may, in its sole discretion, release any Bid and return the Bid Security prior to the end of <br />this period. <br />INSTRUCTIONS TO BIDDERS <br />© 2015 Stantec 1 193803415 00 21 13 - 7 <br />