Laserfiche WebLink
SECTION 00 31 00 <br />AVAILABLE PROJECT INFORMATION <br />PART1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes <br />1. Technical Data. <br />1.02 TECHNICAL DATA <br />A. The Technical Data is identified in the Supplementary Conditions. Bidders are responsible for their <br />own interpretation, verification, and use of the Technical Data contained in these reports and <br />drawings consistent with the General Conditions and Supplementary Conditions. Reports, drawings, <br />and other information regarding the Project may be available for Bidder's review at Engineer's <br />office. Schedule a viewing time with the Project Manager. <br />B. Portions of reports and drawings used by the Engineer in the preparation of Bidding Documents <br />are attached to this Section. A list of attachments to this Section include: <br />1. Report prepared by KLM Engineering, Inc. entitled "Elevated Water Tank Inspection Report — <br />1,000,000 Gallon Capacity Tower Number 1, City of Lino Lakes, Minnesota." <br />PART 2 PRODUCTS <br />Not Used. <br />PART 3 EXECUTION <br />Not Used. <br />END OF SECTION <br />AVAILABLE PROJECT INFORMATION <br />© 2015 Stantecl 193803415 00 31 00 - 1 <br />