My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SP0178-2007 <br />Section 4: Fabrication Practices <br />4.1 All design practices in Section 3 shall apply to all <br />fabrication. <br />4.2 All welding shall be continuous. Intermittent or spot <br />welding shall not be allowed. <br />4.3 Fillets and corners must be accessible for grinding. <br />4.4 Field tanks fabricated for use with high -heat -cured <br />linings (e.g., unmodified phenol formaldehyde thermosetting <br />linings) should have bottoms suitably insulated and installed <br />on properly drained foundations to facilitate proper cure of <br />the lining on the floor of the tank. Because the sand -filled <br />earthen foundation, concrete pad, or other similar <br />foundation is a poor insulator, some means must be <br />considered prior to the application of the lining either to <br />override the heat sink or to distribute the heat uniformly. <br />This may be accomplished in several ways: <br />(a) with the use of properly sized heaters; <br />(b) by placing the tank on a concrete pad topped with <br />a 100 -mm (4 -in.) layer of vermiculite concrete; <br />(c) by insulating with a high -compressive -strength <br />structural grade insulation between the tank bottom <br />and foundation; <br />(d) by installing an internal temporary false bottom <br />approximately 1.5 m (5.0 ft) above the floor of the tank <br />prior to the final high-temperature bake; or <br />(e) by other suitable means that practically and <br />effectively ensure a properly cured lining on the tank <br />floor. <br />Section 5: Surface Finish Practices <br />5.1 Sharp edges shall be ground to a smooth radius of at <br />least 3.2 mm (0.13 in.) or as agreed between the tank or <br />vessel fabricator, tank or vessel owner, and lining <br />applicator. <br />5.2 Tank and vessel internal surfaces to be lined shall not <br />be marred by gouges, handling marks, deep scratches, <br />metal stamp marks, slivered steel, or other surface flaws. <br />Flaws shall be repaired by welding or grinding, as <br />appropriate. <br />5.2.1 Limits on surface flaw depth and geometry shall <br />be set by agreement between the tank or vessel <br />fabricator, tank or vessel owner, and lining applicator. <br />5.2.2 All restorative welding shall be performed <br />according to applicable tank or vessel design codes, <br />approved job -specific procedures, or both. <br />5.3 All rough welds shall be ground to remove sharp edges <br />and other such irregularities (see Figure A2, Appendix A). <br />Chipping may be used to remove sharp edges if followed by <br />grinding. See Appendix C for written and graphic <br />descriptions of five degrees of surface finishing of welds <br />that may be specified preparatory to the lining of tanks and <br />vessels. <br />5.3.1 The amount of grinding performed shall be <br />judicious and performed only to the extent necessary to <br />prepare the weld surface and surrounding metal <br />surfaces in accordance with the specification. Over - <br />grinding, which would result in decreasing the wall <br />thickness or the integrity of the weld beyond the <br />limitations imposed by good welding practices, <br />applicable welding codes, or tank or vessel ratings, <br />shall be avoided. <br />5.4 Automatic machine welds may be acceptable as <br />dictated by the specifications for film continuity. <br />5.5 All weld spatter and arc strikes must be removed. <br />Chipping may be used if followed by grinding or the use of <br />an abrasive disc. <br />5.6 If an anti -spatter material is applied adjacent to the <br />weld area prior to welding, the anti -spatter material shall be <br />one that is readily removable. Anti -spatter materials shall <br />be removed prior to abrasive blasting. <br />5.7 When checking weld continuity, the tank or vessel <br />fabricator shall avoid the use of oils, lubricants, or other <br />foreign materials that would leave a contaminating residue <br />not easily removed by abrasive blasting. <br />5.8 Surfaces shall be cleaned and decontaminated as <br />required by the governing lining application specification(s). <br />NACE International 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.