Laserfiche WebLink
Unit Prices have been computed in accordance with paragraph 1 1.03.8 of the General Conditions <br />Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison <br />of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as <br />provided in the Contract Documents. <br />No. Item Units Qty Unit Price Total Price <br />BASE BID: <br />1 MOBILIZATION <br />LS 1 $ <br />2 EXTERIOR CLEANING, SURFACE LS 1 $ <br />PREPARATION, DISPOSAL, AND PAINTING <br />(INCLUDES PAINTING SCHEME) <br />3 INTERIOR DRY CLEANING, SURFACE LS 1 $ $ <br />PREPARATION, DISPOSAL AND PAINTING AS <br />SPECIFIED <br />4 INTERIOR WET CLEANING, SURFACE LS 1 $ $ <br />PREPARATION, DISPOSAL AND PAINTING AS <br />SPECIFIED <br />5 STRUCTURAL REPAIRS AND MODIFICATIONS LS 1 $ $ <br />6 WELDING, GRINDING, AND REMOVAL OF HR 65 $ $ <br />ERECTION BRACKET SCAB MARKS AND WELD <br />SPATTER <br />7 FULL NEGATIVE AIR CONTAINMENT LS 1 $ $ <br />8 SEEDING, INCL SEED, FERTILIZER, MULCH AC 0.4 $ $ <br />AND MINIMUM 4" TOPSOIL <br />TOTAL BASE BID $ <br />ALTERNATE NO. 1 <br />1 DEDUCT FOR SINGLE COLOR LOGO LS 1 $ $ <br />TOTAL ALTERNATE NO.1 $ <br />0 2015 Stantec 1 193803415 <br />00 41 10 - 3 BID FORM <br />