My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or <br />personal property. <br />26. Milestone—A principal event specified in the Contract Documents relating to an <br />intermediate completion date or time prior to Substantial Completion of all the Work. <br />27. Notice of Award—The written notice by Owner to the Successful Bidder stating that upon <br />timely compliance by the Successful Bidder with the conditions precedent listed therein, <br />Owner will sign and deliver the Agreement. <br />28. Notice to Proceed—A written notice given by Owner to Contractor fixing the date on which <br />the Contract Times will commence to run and on which Contractor shall start to perform <br />the Work under the Contract Documents. <br />29. Owner—The individual or entity with whom Contractor has entered into the Agreement and <br />for whom the Work is to be performed. <br />30. PCBs—Polychlorinated biphenyls. <br />31. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at <br />standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds <br />per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, <br />kerosene, and oil mixed with other non -Hazardous Waste and crude oils. <br />32. Progress Schedule—A schedule, prepared and maintained by Contractor, describing the <br />sequence and duration of the activities comprising the Contractor's plan to accomplish the <br />Work within the Contract Times. <br />33. Project—The total construction of which the Work to be performed under the Contract <br />Documents may be the whole, or a part. <br />34. Project Manual—The bound documentary information prepared for bidding and <br />constructing the Work. A listing of the contents of the Project Manual, which may be bound <br />in one or more volumes, is contained in the table(s) of contents. <br />35. Radioactive Material—Source, special nuclear, or byproduct material as defined by the <br />Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. <br />36. Resident Project Representative—The authorized representative of Engineer who may be <br />assigned to the Site or any part thereof <br />37. Samples—Physical examples of materials, equipment, or workmanship that are <br />representative of some portion of the Work and which establish the standards by which such <br />portion of the Work will be judged. <br />38. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required <br />submittals and the time requirements to support scheduled performance of related <br />construction activities. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 3 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.