My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employees, agents, consultants, or subcontractors, any duty or authority to supervise or <br />direct the performance of the Work or any duty or authority to undertake responsibility <br />inconsistent with the provisions of the Contract Documents. <br />3.03 Reporting and Resolving Discrepancies <br />A. Reporting Discrepancies: <br />1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking <br />each part of the Work, Contractor shall carefully study and compare the Contract <br />Documents and check and verify pertinent figures therein and all applicable field <br />measurements. Contractor shall promptly report in writing to Engineer any conflict, error, <br />ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and <br />shall obtain a written interpretation or clarification from Engineer before proceeding with <br />any Work affected thereby. <br />2. Contractor's Review of Contract Documents During Performance of Work: If, during the <br />performance of the Work, Contractor discovers any conflict, error, ambiguity, or <br />discrepancy within the Contract Documents, or between the Contract Documents and (a) <br />any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) <br />any instruction of any Supplier, then Contractor shall promptly report it to Engineer in <br />writing. Contractor shall not proceed with the Work affected thereby (except in an <br />emergency as required by Paragraph 6.16.A) until an amendment or supplement to the <br />Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. <br />3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error, <br />ambiguity, or discrepancy in the Contract Documents unless Contractor had actual <br />knowledge thereof. <br />B. Resolving Discrepancies: <br />1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of <br />the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or <br />discrepancy between the provisions of the Contract Documents and: <br />a. the provisions of any standard, specification, manual, or code, or the instruction of any <br />Supplier (whether or not specifically incorporated by reference in the Contract <br />Documents); or <br />b. the provisions of any Laws or Regulations applicable to the performance of the Work <br />(unless such an interpretation of the provisions of the Contract Documents would result <br />in violation of such Law or Regulation). <br />3.04 Amending and Supplementing Contract Documents <br />A. The Contract Documents may be amended to provide for additions, deletions, and revisions in <br />the Work or to modify the terms and conditions thereof by either a Change Order or a Work <br />Change Directive. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 9 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.