My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a <br />proposed item of material or equipment will be considered functionally equal to an item so <br />named if: <br />a. in the exercise of reasonable judgment Engineer determines that: <br />1) it is at least equal in materials of construction, quality, durability, appearance, <br />strength, and design characteristics; <br />2) it will reliably perform at least equally well the function and achieve the results <br />imposed by the design concept of the completed Project as a functioning whole; and <br />3) it has a proven record of performance and availability of responsive service. <br />b. Contractor certifies that, if approved and incorporated into the Work: <br />1) there will be no increase in cost to the Owner or increase in Contract Times; and <br />2) it will conform substantially to the detailed requirements of the item named in the <br />Contract Documents. <br />2. Substitute Items: <br />a. If in Engineer's sole discretion an item of material or equipment proposed by Contractor <br />does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it will be considered a <br />proposed substitute item. <br />b. Contractor shall submit sufficient information as provided below to allow Engineer to <br />determine if the item of material or equipment proposed is essentially equivalent to that <br />named and an acceptable substitute therefor. Requests for review of proposed substitute <br />items of material or equipment will not be accepted by Engineer from anyone other than <br />Contractor. <br />c. The requirements for review by Engineer will be as set forth in Paragraph 6.05.A.2.d, as <br />supplemented by the General Requirements, and as Engineer may decide is appropriate <br />under the circumstances. <br />d. Contractor shall make written application to Engineer for review of a proposed <br />substitute item of material or equipment that Contractor seeks to furnish or use. The <br />application: <br />1) shall certify that the proposed substitute item will: <br />a) perform adequately the functions and achieve the results called for by the general <br />design, <br />b) be similar in substance to that specified, and <br />c) be suited to the same use as that specified; <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 24 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.