Laserfiche WebLink
C. Submittal Procedures: <br />1. Before submitting each Shop Drawing or Sample, Contractor shall have: <br />a. reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and <br />Samples and with the requirements of the Work and the Contract Documents; <br />b. determined and verified all field measurements, quantities, dimensions, specified <br />performance and design criteria, installation requirements, materials, catalog numbers, <br />and similar information with respect thereto; <br />c. determined and verified the suitability of all materials offered with respect to the <br />indicated application, fabrication, shipping, handling, storage, assembly, and installation <br />pertaining to the performance of the Work; and <br />d. determined and verified all information relative to Contractor's responsibilities for <br />means, methods, techniques, sequences, and procedures of construction, and safety <br />precautions and programs incident thereto. <br />2. Each submittal shall bear a stamp or specific written certification that Contractor has <br />satisfied Contractor's obligations under the Contract Documents with respect to <br />Contractor's review and approval of that submittal. <br />3. With each submittal, Contractor shall give Engineer specific written notice of any variations <br />that the Shop Drawing or Sample may have from the requirements of the Contract <br />Documents. This notice shall be both a written communication separate from the Shop <br />Drawings or Sample submittal; and, in addition, by a specific notation made on each Shop <br />Drawing or Sample submitted to Engineer for review and approval of each such variation. <br />D. Engineer's Review: <br />1. Engineer will provide timely review of Shop Drawings and Samples in accordance with the <br />Schedule of Submittals acceptable to Engineer. Engineer's review and approval will be only <br />to determine if the items covered by the submittals will, after installation or incorporation in <br />the Work, conform to the information given in the Contract Documents and be compatible <br />with the design concept of the completed Project as a functioning whole as indicated by the <br />Contract Documents. <br />2. Engineer's review and approval will not extend to means, methods, techniques, sequences, <br />or procedures of construction (except where a particular means, method, technique, <br />sequence, or procedure of construction is specifically and expressly called for by the <br />Contract Documents) or to safety precautions or programs incident thereto. The review and <br />approval of a separate item as such will not indicate approval of the assembly in which the <br />item functions. <br />3. Engineer's review and approval shall not relieve Contractor from responsibility for any <br />variation from the requirements of the Contract Documents unless Contractor has complied <br />with the requirements of Paragraph 6.17.C.3 and Engineer has given written approval of <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 32 of 62 <br />00 72 05 <br />