My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.03 Project Representative <br />A. If Owner and Engineer agree, Engineer will furnish a Resident Project Representative to assist <br />Engineer in providing more extensive observation of the Work. The authority and <br />responsibilities of any such Resident Project Representative and assistants will be as provided in <br />the Supplementary Conditions, and limitations on the responsibilities thereof will be as provided <br />in Paragraph 9.09. If Owner designates another representative or agent to represent Owner at <br />the Site who is not Engineer's consultant, agent or employee, the responsibilities and authority <br />and limitations thereon of such other individual or entity will be as provided in the <br />Supplementary Conditions. <br />9.04 Authorized Variations in Work <br />A. Engineer may authorize minor variations in the Work from the requirements of the Contract <br />Documents which do not involve an adjustment in the Contract Price or the Contract Times and <br />are compatible with the design concept of the completed Project as a functioning whole as <br />indicated by the Contract Documents. These may be accomplished by a Field Order and will be <br />binding on Owner and also on Contractor, who shall perform the Work involved promptly. If <br />Owner or Contractor believes that a Field Order justifies an adjustment in the Contract Price or <br />Contract Times, or both, and the parties are unable to agree on entitlement to or on the amount <br />or extent, if any, of any such adjustment, a Claim may be made therefor as provided in <br />Paragraph 10.05. <br />9.05 Rejecting Defective Work <br />A. Engineer will have authority to reject Work which Engineer believes to be defective, or that <br />Engineer believes will not produce a completed Project that conforms to the Contract <br />Documents or that will prejudice the integrity of the design concept of the completed Project as <br />a functioning whole as indicated by the Contract Documents. Engineer will also have authority <br />to require special inspection or testing of the Work as provided in Paragraph 13.04, whether or <br />not the Work is fabricated, installed, or completed. <br />9.06 Shop Drawings, Change Orders and Payments <br />A. In connection with Engineer's authority, and limitations thereof, as to Shop Drawings and <br />Samples, see Paragraph 6.17. <br />B. In connection with Engineer's authority, and limitations thereof, as to design calculations and <br />design drawings submitted in response to a delegation of professional design services, if any, <br />see Paragraph 6.21. <br />C. In connection with Engineer's authority as to Change Orders, see Articles 10, 11, and 12. <br />D. In connection with Engineer's authority as to Applications for Payment, see Article 14. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 39 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.