My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant <br />to Paragraphs 11.01.A and 11.01.B, Contractor will establish and maintain records thereof in <br />accordance with generally accepted accounting practices and submit in a form acceptable to <br />Engineer an itemized cost breakdown together with supporting data. <br />11.02 Allowances <br />A. It is understood that Contractor has included in the Contract Price all allowances so named in <br />the Contract Documents and shall cause the Work so covered to be performed for such sums <br />and by such persons or entities as may be acceptable to Owner and Engineer. <br />B. Cash Allowances: <br />1. Contractor agrees that: <br />a. the cash allowances include the cost to Contractor (less any applicable trade discounts) <br />of materials and equipment required by the allowances to be delivered at the Site, and all <br />applicable taxes; and <br />b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, <br />profit, and other expenses contemplated for the cash allowances have been included in <br />the Contract Price and not in the allowances, and no demand for additional payment on <br />account of any of the foregoing will be valid. <br />C. Contingency Allowance: <br />1. Contractor agrees that a contingency allowance, if any, is for the sole use of Owner to <br />cover unanticipated costs. <br />D. Prior to final payment, an appropriate Change Order will be issued as recommended by <br />Engineer to reflect actual amounts due Contractor on account of Work covered by allowances, <br />and the Contract Price shall be correspondingly adjusted. <br />11.03 Unit Price Work <br />A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, <br />initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to <br />the sum of the unit price for each separately identified item of Unit Price Work times the <br />estimated quantity of each item as indicated in the Agreement. <br />B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the <br />purpose of comparison of Bids and determining an initial Contract Price. Determinations of the <br />actual quantities and classifications of Unit Price Work performed by Contractor will be made <br />by Engineer subject to the provisions of Paragraph 9.07. <br />C. Each unit price will be deemed to include an amount considered by Contractor to be adequate <br />to cover Contractor's overhead and profit for each separately identified item. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 46 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.