My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee <br />and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.01.C.2.b is <br />that the Subcontractor who actually performs the Work, at whatever tier, will be paid a <br />fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs <br />11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will <br />each be paid a fee of five percent of the amount paid to the next lower tier <br />Subcontractor; <br />d. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.4, <br />11.01.A.5, and 11.01.B; <br />e. the amount of credit to be allowed by Contractor to Owner for any change which results <br />in a net decrease in cost will be the amount of the actual net decrease in cost plus a <br />deduction in Contractor's fee by an amount equal to five percent of such net decrease; <br />and <br />f. when both additions and credits are involved in any one change, the adjustment in <br />Contractor's fee shall be computed on the basis of the net change in accordance with <br />Paragraphs 12.01.C.2.a through 12.01.C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A. The Contract Times may only be changed by a Change Order. Any Claim for an adjustment in <br />the Contract Times shall be based on written notice submitted by the party making the Claim to <br />the Engineer and the other party to the Contract in accordance with the provisions of Paragraph <br />10.05. <br />B. Any adjustment of the Contract Times covered by a Change Order or any Claim for an <br />adjustment in the Contract Times will be determined in accordance with the provisions of this <br />Article 12. <br />12.03 Delays <br />A. Where Contractor is prevented from completing any part of the Work within the Contract <br />Times due to delay beyond the control of Contractor, the Contract Times will be extended in an <br />amount equal to the time lost due to such delay if a Claim is made therefor as provided in <br />Paragraph 12.02.A. Delays beyond the control of Contractor shall include, but not be limited to, <br />acts or neglect by Owner, acts or neglect of utility owners or other contractors performing <br />other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, <br />or acts of God. <br />B. If Owner, Engineer, or other contractors or utility owners performing other work for Owner as <br />contemplated by Article 7, or anyone for whom Owner is responsible, delays, disrupts, or <br />interferes with the performance or progress of the Work, then Contractor shall be entitled to an <br />equitable adjustment in the Contract Price or the Contract Times, or both. Contractor's <br />entitlement to an adjustment of the Contract Times is conditioned on such adjustment being <br />essential to Contractor's ability to complete the Work within the Contract Times. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 48 of 62 <br />00 72 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.