Laserfiche WebLink
SECTION 00 73 05 <br />SUPPLEMENTARY CONDITIONS <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. C-700, 2002 Edition) and other provisions of the Contract Documents as <br />indicated below. All provisions, which are not so amended or supplemented, remain in full force <br />and effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the General <br />Conditions. Additional terms used in these Supplementary Conditions have the meanings indicated <br />below, which are applicable to both the singular and plural thereof. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />SC -1.01.A.45 Add the following language at the end of the definition: <br />The Work is considered Substantially Complete when Elevated Tank No. 1 is disinfected <br />successfully, filled with water and is fully operation and allowed to be placed in service. <br />The driveway, grading, and seeding/sodding shall also be in place. <br />SC -1.02 Add the following new paragraph immediately after Paragraph 1.02.E: <br />F. The Specifications are written in imperative mood and streamlined form. This imperative <br />language is directed to the Contractor, unless specifically noted otherwise. The words <br />"shall be" are included by inference where a colon (:) is used within sentences or phrases. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />SC -2.01.8 Delete Paragraph 2.01.6 in its entirety and insert the following in its place: <br />B. Evidence of Insurance: Before any Work at the Site is started, Contractor shall deliver to <br />Owner, with copies to Engineer and to each additional insured identified in the <br />Supplementary Conditions, certificates of insurance, on forms acceptable to Owner, <br />which reflect the proper evidence of insurance which Contractor is required to purchase <br />and maintain in accordance with Article 5. <br />ARTICLE 5 - BONDS AND INSURANCE <br />SC -5.01 Add the following new paragraph immediately after Paragraph 5.01.0: <br />D. Separate performance and payment bonds should be submitted utilizing EJCDC Form <br />Number 00610 and 00615 (2007 Editions) or a similar bond form, if approved by Owner. <br />SC -5.03.A Delete Paragraph 5.03.A in its entirety and insert the following in its place: <br />A. Contractor shall deliver to Owner, with copies to each additional insured identified in the <br />Supplementary Conditions, certificates of insurance, on duplicate forms acceptable to <br />Owner, which provide evidence that Contractor has purchased and is maintaining the <br />insurance which Contractor is required to purchase and maintain. <br />SUPPLEMENTARY CONDITIONS <br />© 2015 Stantec 1 193803415 00 73 05 - 1 <br />