My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 31 23 13 <br />SUBGRADE PREPARATION <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. SECTION INCLUDES <br />1. Grading, shaping, and compacting subgrade prior to placing a base or surface <br />course. <br />B. RELATED SECTIONS <br />1. Section 31 23 00 - Excavation and Fill. <br />1.02 MEASUREMENT AND PAYMENT <br />A. All Work and costs of this Section shall be incidental to the Project and be included in the <br />Lump Sum Base Bid. <br />1.03 REFERENCES <br />A. Minnesota Department of Transportation "Standard Specifications for Construction," <br />2014 Edition (MnDOT Spec.) <br />1. 2105 - Excavation and Embankment. <br />2. 21 1 1 - Test Rolling. <br />3. 2112 - Subgrade Preparation. <br />1.04 SEQUENCING AND SCHEDULING <br />A. Subgrade preparation shall be performed prior to placement of the aggregate backfill <br />material if excavation and rough grading of subgrade is not performed under this <br />Contract. <br />B. Subgrade preparation shall be performed on the existing gravel base prior to placement <br />of additional gravel base material. <br />C. Subgrade preparation shall be performed prior to placement of the concrete curb and <br />gutter. <br />D. Complete subgrade for streets, driveways, walks, and parking lots immediately after <br />installation of pipe as part of trench backfill and compaction. <br />E. Subgrade preparation shall be performed prior to placement of the <br />bituminous/aggregate base course. <br />PART 2 PRODUCTS <br />Not Used. <br />SUBGRADE PREPARATION <br />© 2015 Stantec 1 193803415 31 23 13 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.