My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
09-08-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:45:23 AM
Creation date
1/13/2016 9:44:44 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />September 2, 2015 <br />Page 3 <br /> <br />5. Update Preliminary Plan / Cost Estimate <br />Information gathered during Task 4 will be incorporated into the design for the outlet and <br />an updated preliminary plan and cost estimate will be developed. <br /> <br />Schedule and Cost <br />It is anticipated this work can be completed in three weeks at a cost of $2,580. <br /> <br />6. Update RCWD Hydrologic Model for Improvements <br />The RCWD has indicated that when the preliminary design is complete, the RCWD’s <br />Hydrologic model must be updated to reflect this outlet project being installed. In order <br />to verify the feasibility of the project, development and submittal of this information has <br />been incorporated into this work plan. Modifications to the model following this <br />submittal would be an extra to this scope of work. <br /> <br />Schedule and Cost <br />It is anticipated this work can be completed in three weeks at a cost of $12,312. <br /> <br />7. Prepare Feasibility Report <br />As part of this task, the feasibility report will be prepared that outlines need for the <br />project, options considered, description of recommended design option and cost, a <br />discussion of financing options, and other standard information that is required for <br />inclusion in a feasibility report. <br /> <br />Schedule and Cost <br />It is anticipated that this work can be completed in three weeks at a cost of $7,604. <br /> <br />8. Review Plan and Feasibility Report with City Staff and Stakeholders <br />This task includes reviewing the draft feasibility report with stakeholders and, based on <br />input received, make appropriate additions, deletions, or corrections. Please note that <br />only general approaches to funding and financing this project will be discussed within <br />this report, and no defined assessment role is anticipated to be prepared at this time. <br /> <br />Schedule and cost <br />It is anticipated this work will be completed within three weeks at an estimated cost of <br />$2,716. <br /> <br />9. Submit and Review Results of Feasibility Study with City Council <br />It is anticipated this report will be submitted and reviewed with the City Council at a <br />Council meeting or workshop. Preparation for and attendance at two meetings are <br />anticipated to facilitate this task. <br /> <br />Schedule and Cost <br />It is anticipated this work can be completed in three weeks at a cost of $3,304. <br /> <br /> W:\Proposals\Lino Lakes\LTR - mgrochala - NE Area 061715.doc
The URL can be used to link to this page
Your browser does not support the video tag.