My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-012 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2015
>
2015-012 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 11:19:02 AM
Creation date
1/19/2016 10:23:42 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/23/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Connection Fee <br />ontractor License Verification <br />Contractor Lead Certification Verification (effective Feb 1, 2011) <br />Contractor License <br />SAC (Sewer Availability Charge) <br />3/4" Water Meter <br />1" Water Meter <br />MXU Unit <br />City cost plus <br />City cost plus <br />City cost plus <br />Touch Pad <br />Curb Stop Covers <br />Septic Installation or Repair Permit <br />Septic Pumping Permit <br />Demolition Permit <br />,awn Sprinkler/Irrigation System Permit (effective June 26, 2008) <br />~rfrigating or Watering of New Landscaping Permit (sod or seed) <br />Lawn Sprinkling Violation <br />$250.00 <br />$5.00 per permit <br />$5.00 per permit <br />$50.00 <br />Per Met Council <br />10% handling fee andsalmi <br />10% handling fee and -sales -tax <br />1 0% handling fee <br />$18.00 <br />$70.00 plus -sales -tax <br />$200.00 <br />$10.00 <br />$65.00 <br />$65.00 <br />No Charge <br />$25.00 for first violation <br />$50.00 for each subsequent citation <br />Driveway Replacement Permit $65.00 <br />Sign Permit: Existing Billboard <br />Sign Permit: Permanent <br />Sign Permit: Sandwich Board <br />Sign Permit: Temporary (portable/banner) <br />$85.00 per year <br />See Building Fee Table <br />$25.00 <br />$25.00/Term <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. <br />Plan review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made outside of normal business hours is a three-hour minimum charge <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />*** Actual costs include administrative and overhead costs. <br />'.. n escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.