My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016 Annual Budget Adopted
LinoLakes
>
Finance
>
Budget
>
Budget Adopted
>
2016 Annual Budget Adopted
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 12:11:22 PM
Creation date
1/27/2016 3:40:42 PM
Metadata
Fields
Template:
Finance Dept
Finance Category
Budget
Date
12/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br />ENGINEERING (101-417) <br />BUDGET DETAIL <br />Object Code <br />4300-000 Professional Services <br />Traffic Counts <br />Engineering Consultant (hourly) <br />4410-000 Contractual Services <br />Engineering Consultant (Retainer) <br />Contracted Svcs: Annual Maintenance - Trimble GPS Software Maintenance Agmt <br />ArcView Annual Maintenance <br />5000-000 Capital Outlay <br />NOTE: <br />1) General Engineering (WSB Retainer) <br />Corn. Dev 58,776 <br />Water Dept 11,670 <br />Sewer Dept. 11,670 <br />Total 82,116 <br />2) Engineering Expenditures included elsewhere: <br />Water Department 25,000 <br />Sewer Department (estimate) 25,000 <br />Streets Dept. (contracted storm sewer) 15,000 <br />Pavement Management (estimate) 40,000 <br />Total Engineering including Comm. Dev. <br />105,000 <br />210,276 <br />44,500 <br />60,776 <br />
The URL can be used to link to this page
Your browser does not support the video tag.