Contract Time, Definition of
<br />8.1.1
<br />CONTRACTOR
<br />3
<br />Contractor, Definition of
<br />3.1, 6.1.2
<br />Contractor's Construction Schedules
<br />3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
<br />Contractor's Employees
<br />3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3,
<br />11.1.1, 11.3.7, 14.1, 14.2.1.1,
<br />Contractor's Liability Insurance
<br />11.1
<br />Contractor's Relationship with Separate Contractors
<br />and Owner's Forces
<br />3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4
<br />Contractor's Relationship with Subcontractors
<br />1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2,
<br />11.3.1.2, 11.3.7, 11.3.8
<br />Contractor's Relationship with the Architect
<br />1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1,
<br />3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2,
<br />6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6,
<br />10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1
<br />Contractor's Representations
<br />3.2.1, 3.2.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2
<br />Contractor's Responsibility for Those Performing the
<br />Work
<br />3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1, 10.2.8
<br />Contractor's Review of Contract Documents
<br />3.2
<br />Contractor's Right to Stop the Work
<br />9.7
<br />Contractor's Right to Terminate the Contract
<br />14.1, 15.1.6
<br />Contractor's Submittals
<br />3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2,
<br />9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2
<br />Contractor's Superintendent
<br />3.9, 10.2.6
<br />Contractor's Supervision and Construction
<br />Procedures
<br />1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4,
<br />7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3
<br />Contractual Liability Insurance
<br />11.1.1.8, 11.2
<br />Coordination and Correlation
<br />1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1
<br />Copies Furnished of Drawings and Specifications
<br />1.5, 2.2.5, 3.11
<br />Copyrights
<br />1.5, 3.17
<br />Correction of Work
<br />2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2
<br />Correlation and Intent of the Contract Documents
<br />1.2
<br />Cost, Definition of
<br />7.3.7
<br />Costs
<br />2.4.1, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3,
<br />7.3.3.3, 7.3.7, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6,
<br />11.3,12.1.2,12.2.1,12.2.4,1-3:5,14
<br />Cutting and Patching
<br />3.14, 6.2.5 s
<br />Damage to Construction of Owner or Separate
<br />Contractors § _
<br />3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4;-11.1..1;-11 3;-- -.
<br />12.2.4
<br />Damage to the Work
<br />3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4.1, 11.3.1, 12.2.4
<br />Damages, Claims for
<br />3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1;'9:6.7, 10.3.3, 11.1.1,
<br />11.3.5, 11.3.7, 14.1.3, 14.2.4, 11.1.6
<br />6.1.1,8.3.3,9.5.1.6,9.7,10.3.2;•)
<br />Date of Commencement o1 the Work, Definition of
<br />8.1.2
<br />Date of Substantial Completion, Definition of
<br />8.1.3.
<br />Day, Definition of
<br />8.1.4
<br />Decisions of the Architect
<br />3.7.4,4.2.6,4.2.7,4.2.11,4.2.12,4.2.13, 15:2;6.3,
<br />7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4,9.5:1, 9.8.459.9k1,
<br />13.5.2,14.2.2,14.2.4,15.1,15.2
<br />Decisions to Withhold Certification
<br />9.4.1, 9.5, 9.7, 14.1.1.3
<br />Damages for Delay ; C
<br />Defective or Nonconforming Work, Acceptance,
<br />Rejection and Correction of
<br />2.3.1, 2.4.1, 3.5.1, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6,
<br />9.8.2, 9.9.3, 9.10.4, 12.2.1
<br />Defective Work, Definition of
<br />3.5.1
<br />Definitions
<br />1.1, 2.1.1, 3.1.1, 3.5.1, 3.12.1, 3`12.2, 3.12;3,
<br />15.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 8 1, 9.1, 9.811
<br />Delays and Extensions of Time
<br />3.2., 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4.1, 8.3, 9.5.1, 9.7.1,
<br />10.3.2,10.4.1,14.3.2,15.1415.2.5 --_
<br />Disputes
<br />6.3.1, 7.3.9, 15.1, 15.2 "— :--- = --
<br />Documents
<br />Documents and Samples at the Site
<br />3.11
<br />Drawings, Definition of
<br />1.1.5
<br />Drawings and Specifications; Use 'and Ownership of
<br />3.11 i '
<br />I
<br />Effective Date of Insurance
<br />8.2.2, 11.1.2
<br />Emergencies
<br />10.4, 14.1.1.2, 15.1.4
<br />AIA Document A201' - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
<br />American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International
<br />Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal
<br />penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 15:05:44 on
<br />08/20/2009 under Order No.37269892921 which expires on 05/28/2010, and is not for resale.
<br />User Notes:
<br />(926118731)
<br />4
<br />--
<br />
|