Subcontractor, Defmition of
<br />5.1.1
<br />SUBCONTRACTORS
<br />5
<br />Subcontractors, Work by
<br />1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2,
<br />9.6.7
<br />Subcontractual Relations
<br />5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 11.4.7, 11.4.8,
<br />14.1, 14.2.1
<br />Submittals
<br />3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3,
<br />9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3
<br />Submittal Schedule
<br />3.10.2, 3.12.5, 4.2.7
<br />Subrogation, Waivers of
<br />6.1.1, 11.4.5, 11.3.7
<br />Substantial Completion
<br />4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,
<br />12.2, 13.7
<br />Substantial Completion, Definition of
<br />9.8.1
<br />Substitution of Subcontractors
<br />5.2.3, 5.2.4
<br />Substitution of Architect
<br />4.1.3
<br />Substitutions of Materials
<br />3.4.2, 3.5.1, 7.3.8
<br />Sub -subcontractor, Definition of
<br />5.1.2
<br />Subsurface Conditions
<br />3.7.4
<br />Successors and Assigns
<br />13.2
<br />Superintendent
<br />3.9, 10.2.6
<br />Supervision and Construction Procedures
<br />1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4,
<br />7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.3
<br />Surety
<br />5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2, 15.2.7
<br />Surety, Consent of
<br />9.10.2, 9.10.3
<br />Surveys
<br />2.2.3
<br />Suspension by the Owner for Convenience
<br />14.3
<br />Suspension of the Work
<br />5.4.2, 14.3
<br />Suspension or Termination of the Contract
<br />5.4.1.1, 11.4.9, 14
<br />Taxes
<br />3.6, 3.8.2.1, 7.3.7.4
<br />Termination by the Contractor
<br />14.1, 15.1.6
<br />Termination by the Owner for Cause
<br />5.4.1.1, 14.2, 15.1.6
<br />Termination by the Owner for Convenience
<br />14.4
<br />Termination of the Architect
<br />4.1.3
<br />Termination of the Contractor
<br />14.2.2
<br />TERMINATION OR SUSPENSION OF THE
<br />CONTRACT
<br />14
<br />Tests and Inspections
<br />3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.29,
<br />9.10.1,10.3.2,11.4.1.1,12.2.1,13.5
<br />TIME
<br />4 R
<br />8 l
<br />Time, Delays and Extensions of
<br />3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3:1,'7.4.1, 8.3, 9.5.1, 9.7.1,
<br />10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5 �1
<br />Time Limits (
<br />2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3:11„3.12.5,3.15.1!4.2,
<br />4.4, 4.5, 5.2, 5.3, 5.4, 6.2.4, 7.3,'x7.4, 8.2, 9.2,
<br />9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 111.3;
<br />11.4.1.5,11.4.6,11.4.10,122,1'3.5;13.'7 14,15:1.2; r
<br />15.4
<br />Time Limits on Claims
<br />3.7.4, 10.2.8, 13.7, 15.1.2
<br />Title to Work
<br />9.3.2, 9.3.3
<br />Transmission of Data in Digital Form
<br />1.6 ;,.,„-
<br />UNCOVERING AND CORRECTION OF
<br />WORK
<br />12
<br />Uncovering of Work
<br />12.1
<br />Unforeseen Conditions, Concealed or Unknown
<br />3.7.4, 8.3.1, 10.3
<br />Unit Prices
<br />7.3.3.2, 7.3.4
<br />Use of Documents
<br />1.1.1, 1.5, 2.2.5, 3.12.6, 5.
<br />Use of Site
<br />3.13, 6.1.1, 6.2.1
<br />Values, Schedule of
<br />9.2, 9.3.1
<br />Waiver of Claims by the Architect = --
<br />13.4.2
<br />Waiver of Claims by the Contractor
<br />9.10.5, 11.4.7, 13.4.2, 15.1.6
<br />Waiver of Claims by the Owner
<br />9.9.3, 9.10.3, 9.10.4, 11.4.3,11.46,11.4.7,12.2.2.1,
<br />13.4.2, 14.2.4, 15.1.6 ;E
<br />Waiver of Consequential Damages
<br />14.2.4, 15.1.6
<br />9.10.2, 9.10.4
<br />Waivers of Subrogation
<br />6.1.1, 11.4.5, 11.3.7
<br />Waiver of Liens
<br />AIA Document A201' - 2007. Copyright O 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
<br />American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International
<br />Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal
<br />penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 15:05:44 on
<br />08/20/2009 under Order No.37269892921 which expires on 05/28/2010, and is not for resale.
<br />User Notes:
<br />(926118731)
<br />
|