My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the operations. The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but <br />shall continue with all other operations that do not affect those remains or features. Requests for adjustments in the <br />Contract Sum and Contract Time arising from the existence of such remains or features may be made as provided in <br />Article 15.. <br />§ 3.8 ALLOWANCES <br />§ 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items <br />covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, <br />but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable <br />objection. <br />§ 3.8.2 Unless otherwise provided in the Contract Documents, <br />.1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and <br />all required taxes, less applicable trade discounts; ' a <br />.2 Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and <br />other expenses contemplated for stated allowance amounts shall be includecIin the Contract Sum but <br />not in the allowances; and" <br />.3 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly <br />by Change Order. The amount of the Change Order shall reflect (1) the difference between actual <br />costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor's costs under Section <br />3.8.2.2. <br />t=_ a — <br />§ 3.8.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness.,,_r <br />§ 3.9 SUPERINTENDENT <br />§ 3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance' <br />at the Project site during performance of the Work. The superintendent shall represent the Contractor, and , <br />communications given to the superintendent shall be as binding as if given to the Contractor. <br />§ 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner <br />through the Architect the name and qualifications of a proposed superintendent. The Architect may reply within 14 <br />days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to the L. <br />proposed superintendent or (2) that the Architect requires additional time to review. Failure of the Architect to reply <br />within the 14 day period shall constitute notice of no reasonable objection. <br />§ 3.9.3 The Contractor shall not employ a proposed superintendent to whom the Owner or Architect -has made <br />reasonable and timely objection. The Contractor shall not change the superintendent withouttlie Owner's -consent, <br />which shall not unreasonably be withheld or delayed. <br />§ 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES t <br />§ 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and <br />Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits <br />current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the <br />Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall <br />provide for expeditious and practicable execution of the Work. <br />§ 3.10.2 The Contractor shall prepare a submittal schedule, promptly after being awarded the Contract and thereafter, <br />as necessary to maintain a current submittal schedule, and shall submit the schedule(s) for the Architect's approval. <br />The Architect's approval shall not unreasonably be delayed or withheld. The submittal schedule shall (1) be <br />coordinated with the Contractor's construction schedule, and (2) allow the Architect reasonable time to review <br />submittals. If the Contractor fails to submit a submittal schedule, the Contractor shall not be entitled to any increase <br />in Contract Sum or extension of Contract Time based on the time required for review of submittals. <br />§ 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to <br />the Owner and Architect. <br />AIA Document A201s' — 2007. Copyright 8 1911, 1915, 1918, 1925, 1937, 1951, <br />American Institute of Architects. A11 rights reserved. WARNING: This AIA' <br />Treaties. Unauthorized reproduction or distribution of this AIA5 Document, <br />penalties, and will be prosecuted to the maximum extent possible under the <br />08/20/2009 under Order No.37269892921 which expires on 05/28/2010, and is <br />User Notes: <br />1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The <br />Document is protected by U.S. Copyright Law and International <br />or any portion of it, may result in severe civil and criminal <br />law. This draft was produced by AIA software at 15:05:44 on <br />not for resale. <br />(926118731) <br />