My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 45 16 <br />CONTRACTOR'S QUALITY CONTROL <br />PART 1 - GENERAL <br />1.01 Project Manual: <br />A. A copy of the Project Manual, Specifications and Detail Drawings (including all <br />addenda and change orders) is required to be available on the project site at all <br />times. <br />1.02 Material Quality: <br />A. Materials incorporated into project shall be new, except as otherwise indicated in <br />the contract documents, of specified quality, and furnished in sufficient quantity <br />to facilitate proper and speedy execution of the work. <br />B. Contractor shall furnish evidence of the quality of materials incorporated into <br />project as required by the contract documents or at the request of <br />Architect/Engineer. <br />C. Materials not meeting requirements of the contract documents shall be removed <br />from project and replaced with materials meeting contract document requirements <br />by Contractor with no additional expense to Owner. <br />1.03 Asbestos: <br />A. Refer to Section 01 11 00, Summary of Work, for hazardous materials identified <br />on the site. <br />B. The contract documents for this project have been prepared in accordance with <br />generally accepted professional Architectural and Engineering practices. <br />Accordingly, no asbestos or products containing asbestos have been knowingly <br />specified for this project. Notify the Architect/Engineer immediately for <br />instructions if - <br />1. Materials containing asbestos are brought to the site for inclusion in the <br />work. <br />2. Asbestos materials are encountered in any existing structures upon which <br />work is being performed. <br />C. At Architect's/Engineer's direction and with Owner's approval, an independent <br />testing laboratory will perform testing procedures on suspect materials. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Contractor's Quality Control <br />01 45 16-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.