Laserfiche WebLink
Actions identified by Issue Category <br />Additional <br />Issue(s) <br />Addressed <br />Goals <br />Addressed <br />Policies <br />Addressed <br />2. Wilkinson RMU <br />3. Amelia RMU <br />4. Hardwood Creek RMU <br />5. Rice Lake RMU <br />If need arises and resources allow: <br />Rondeau RMU <br />Upper Rice Creek RMU <br />Centerville RMU <br />Sherman RMU <br />Baldwin RMU <br />Middle Rice Creek RMU <br />Evaluate the need to modify existing ordinances to ensure <br />implementation of all components of the multi -functional <br />greenway corridor. <br />Water Rate & <br />Quantity <br />4.9.2, <br />4.1.1 <br />4.9.2A, <br />4.1.1A <br />Incorporate neighborhood stormwater planning and education <br />into street reconstruction program. <br />Water Rate & <br />Quantity <br />4.9.2, <br />4.1.1 <br />4.9.2A , <br />4.1.1E <br />Evaluate Revisions to Road Design Standards including: <br />Reducing minimum pavement widths <br />Water Rate & <br />4.9.2, <br />4.9.2A, <br />Ribbon curbs and curb cuts, with roadside swales, <br />infiltration, and biofiltration <br />Quantity <br />4.1.1 <br />4.1.1A <br />Use of pervious pavements <br />Provide guidance for staff, City Boards, and City Council <br />Water Rate & <br />4.9.2, <br />4.9.2A, <br />regarding Better Site Design (BSD). <br />Quantity, <br />4.1.1, <br />4.1.1E, <br />Natural <br />Resources <br />4.7.2 <br />4.7.2B <br />Create design guidelines for new development to implement <br />the Resource Management System Plan (multi -functional <br />greenway corridor) through the use of Better Site Design <br />Natural <br />Resources <br />4.9.2, <br />4.7.2 <br />4.9.2A, <br />4.7.2B <br />(BSD). <br />Continue to implement the RMP. <br />Create a wetland bank to provide replacement <br />Water Rate &4.1.1C, <br />4.9.2, <br />4.1.1, <br />4.9.2C <br />opportunities for development or roadway projects. <br />Utilize the runoff volume credit and banking system <br />in collaboration with the RCWD. <br />Quantity, <br />Wetlands <br />4.3.1 <br />4.3.1C, <br />4.3.1D, <br />4.3.1E <br />Continue to participate in pre -permit application meetings <br />with the RCWD and Army Corps of Engineers that support <br />the collaborative permitting process implemented through <br />Water Quality <br />4.9.2, <br />4.2.2 <br />4.9.2B, <br />4.2.2C <br />RCWD Rule and the Corps' Programmatic General Permit <br />that implements the Special Area Management Plan. <br />Implement Construction BMPs Identified in SWPPP. <br />Erosion & <br />4.9.2, <br />4.9.2D, <br />Sediment <br />Control <br />4.8.1 <br />4.8.1D <br />Implement Post -Construction BMPs Identified in SWPPP. <br />Water Rate & <br />Quantity, <br />Erosion & <br />4.9.2, <br />4.9.2D, <br />Sediment <br />4.1.1, <br />4.1.1A, <br />Control, <br />4.8.1, <br />4.8.1D, <br />Maintenance & <br />4.10.1 <br />4.10.1A <br />Inspection <br />Implement Education and Outreach BMPs Identified in <br />Public <br />4.9.2, <br />4.9.2D, <br />SWPPP. <br />Participation, <br />4.11.1, <br />4.11.1A, <br />City of Lino Lakes SWMP 1 December 20151 78 <br />