Laserfiche WebLink
List of Figures <br />Figure 1. City of Lino Lakes Location Map [from SAMP] 9 <br />Figure 2. Resource Management Units [from Comprehensive Plan] 11 <br />Figure 3. Surficial Geology 14 <br />Figure 4. Bedrock Geology 15 <br />Figure 5. Hydrologic Soil Group 17 <br />Figure 6 Infiltration Potential within the Rice Creek Watershed District [from RCWD, 2003 Infiltration <br />Implementation Study] 18 <br />Figure 7. Groundwater contours [from RCWD 2009 Groundwater Planning & Management Program] 20 <br />Figure 8. Groundwater recharge and discharge areas [from RCWD 2009 Groundwater Planning & Mgt. <br />Program] 21 <br />Figure 9. Groundwater dependent resources [from RCWD 2009 Groundwater Planning & Mgt. Program] <br />22 <br />Figure 10. Areas not recommended for infiltration [from RCWD 2009 Groundwater Planning & Mgt. <br />Program] 23 <br />Figure 11. Pollutant reductions required by TMDLs completed within the City of Lino Lakes boundary29 <br />Figure 12. Impaired Lakes within the City of Lino Lakes 29 <br />Figure 13. St. Paul Water Utility Area [from 2005 Lino Lakes Surface Water Management Plan] 31 <br />Figure 14. Nutrient Loading to Wetlands [from SAMP] 34 <br />Figure 15. Wetland Restoration Potential based on MnRAM Evaluation [from SAMP] 35 <br />Figure 16. FEMA Floodplain 37 <br />Figure 17. Points of Flooding Concern identified in Lino Lakes RMP (2008) [from Lino Lakes RMP]39 <br />Figure 18. Ditch Systems in the City of Lino Lakes [from SAMP] 42 <br />Figure 19. Watershed Districts in the City of Lino Lakes 43 <br />Figure 20. Existing Land Use [from Comprehensive Plan] 45 <br />Figure 21. Full Build Out Future Land Use [from Comprehensive Plan] 47 <br />Figure 22.2030 Future Land Use [from Comprehensive Plan] 48 <br />Figure 23. Presettlement Vegetation [from Comprehensive Plan] 51 <br />Figure 24. Land Coverage Map 52 <br />Figure 25. Potential Environmental Hazards 57 <br />Figure 26. Subwatershed phosphorus loading from major drainage areas as calculated in PLOAD. <br />[Reproduced from LL RMP] 59 <br />Figure 27. Subwatershed phosphorus loading from major drainage areas as calculated in P8. [from Lino <br />Lakes Chain of Lakes Draft TMDL] 60 <br />Figure 28. Intercommunity flows 60 <br />Figure 29. Conceptual Lino Lakes Resource Management Unit (RMU) Corridor Configurations 81 <br />City of Lino Lakes SWMP 1 December 20151 iv <br />