Laserfiche WebLink
(i) Place a minimum of four(4) inches of top soil over the completed project and <br /> establish appropriate ground cover within sixty(60) days of completion, or in a time <br /> period consistent with the City's stormwater management and pollution prevention plan. <br /> 0) Reimburse the City for the cost of periodic inspections by the City for the purpose <br /> of determining that the terms under which the permit has been issued are being complied <br /> with. <br /> (k) Implement the tree preservation plan. (Not applicable) <br /> (1) In addition to a conditional use permit,the City Engineer may determine that <br /> permits in excess of twenty-five thousand (25,000) cubic yards require the applicant to <br /> conduct a neighborhood meeting and to notify affected property owners within one- <br /> quarter(1/4)mile. (Not applicable) <br /> (m) Post a form of security and sum as the permitted authority may require, running to <br /> the City, conditioned to pay the City the cost and expense of repairing or cleaning any <br /> highways, streets, or other public ways within the City made necessary by the special <br /> burden resulting from transporting thereon by the applicant material to or from the site, <br /> the amount of such cost to be determined by the Council; and conditioned further to <br /> comply with all the requirements of this Ordinance and the particular permit, and to save <br /> the City free and harmless from all suits or claims for damages resulting from the <br /> negligent excavation, removal, storage, or filling of rock, sand, dirt, gravel, clay, or other <br /> like material within the City. <br /> (n) Other conditions deemed appropriate to the application by the permitting <br /> authority. <br /> NOW,THEREFORE BE IT RESOLVED by the City Council of the City of Lino <br /> Lakes hereby approves the conditional use permit for earth moving, subject to the <br /> following conditions: <br /> 1. All comments from the City Engineer letter dated August 4, 2015 shall be <br /> addressed. <br /> 2. All comments from the Environmental Coordinator letter dated August 27, 2015 <br /> shall be addressed. <br /> 3. A Temporary Access Easement shall be drafted by the applicant and submitted to <br /> the City for review and recording. <br /> 4. A Development Agreement shall be drafted by the City and executed by both <br /> parties and recorded. <br /> 5. The applicant shall obtain all required RCWD permits. <br /> 6. Soil borings for the borrow pit area shall be submitted. <br /> 7. Traffic Generation: <br /> a. Equipment and vehicles shall not use the improved section of Robinson <br /> Drive for access to the borrow pit. <br /> b. The hauling, dumping and grading of excavated materials shall occur <br /> within the boundaries of Century Farm North 6th Addition. <br /> 5 <br />