My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-092 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-092 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 11:43:32 AM
Creation date
3/7/2016 10:20:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />engineering. planning. environmental. construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE and <br />Ed Youngquist <br />Date: August 4, 2015 <br />Re: Morell Borrow Pit Plan Review <br />WSB Project No. 2988-030 <br />The Borrow Pit submittal document received on July 12, 2015 and reviewed here within, <br />included the following: <br />1. Full size Final Plan prepared by Plowe Engineering, Inc. dated July 10, 2015. <br />2. Email from Adam Ginkel to Katie Larsen dated August 3, 2015. <br />3. RCWD 15-018 CAPROC <br />General Comments: <br />1. Obtain permits for the project: NPDES permit, City of Lino Lakes grading permit <br />Grading Plan and Drainage Comments: <br />1. Project cannot disrupt or otherwise alter existing surface water drainage patterns. Existing <br />drainage patterns flow from east to west. <br />2. Prevent general public access and maintain safe site conditions per City Ordinance. <br />3. Future filling of the site will require an additional CUP or Site Development Agreement. <br />This CUP and grading permit does not include borrow pit fill. <br />4. Require that all decomposable material, or other unsuitable foundation material, be removed <br />from the area before deposition of fill begins. <br />5. The excavation of land reclamation project shall be completed by November 30, 2015 and <br />the site restored. <br />6. Place a minimum of four (4) inches of topsoil over all disturbed areas, including haul road, <br />and establish ground cover in a time period consistent with the City's SWPPP. <br />7. Show location of rock construction entrance on plan. <br />8. Acquire temporary access easement across city owned property. <br />9. Soil boring data shall be provided. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />S:\Commwity Development\Projeets\Platming Cases\Morell Borrow Pit CUP \Staff Reports\ 20150914 CO2 20150804 Cit}' Engineer Letter Morell Borrow 151t doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.