Laserfiche WebLink
Implementation Plan must include all elements of the NPDES permit <br />requirements. <br />The SWPPP must include that weekly and post rainfall event inspections will <br />be performed. The inspection reports must be submitted to the City Engineer <br />and the City MS4 inspector in a timely manner. These reports and the <br />SWPPP must be kept on site in a known and accessible location. Failure to <br />perform inspections and follow-up corrections will result in an information <br />request from the city, and if no action is taken by the permit work holder, a <br />stop work order shall be given. <br />• Page 2 <br />