Laserfiche WebLink
Project Material Status <br />Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity <br />to Date <br />Current <br />Quantity <br />Amount to <br />Date <br />A. SURFACE IMPROVEMENTS <br />1 <br />2021.501 <br />MOBILIZATION (5%) <br />LUMP SUM <br />$24,000.00 <br />1 <br />1 <br />0 <br />524,000.00 <br />2 <br />2104.501 <br />REMOVE CONCRETE CURB <br />LIN FT <br />55.00 <br />150 <br />321 <br />112 <br />$1,605.00 <br />3 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$6.70 <br />1240 <br />601 <br />0 <br />54,026.70 <br />4 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />53.00 <br />600 <br />623 <br />0 <br />51,869.00 <br />5 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />$30.00 <br />50 <br />37 <br />0 <br />51,110.00 <br />6 <br />2112.501 <br />SUBGRADE PREPARATION (SPECIAL) <br />ROAD STA <br />568.00 <br />35 <br />35 <br />0 <br />52,380.00 <br />7 <br />2221.501 <br />AGGREGATE SHOULDERING CLASS 5 <br />TON <br />$14.55 <br />310 <br />310 <br />0 <br />$4,510.50 <br />8 <br />2232.604 <br />EDGE MILL BITUMINOUS SURFACE 8' WIDE (0.0" TO 1.5") <br />SQ YD <br />51.43 <br />14120 <br />14620 <br />0 <br />520,906.60 <br />9 <br />2331.604 <br />BITUMINOUS PAVEMENT RECLAMATION <br />SQ YD <br />52.41 <br />12300 <br />10976 <br />0 <br />526,452.16 <br />10 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />52.75 <br />3700 <br />2810 <br />0 <br />57,727.50 <br />11 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (2,13) <br />TON <br />561.62 <br />4700 <br />4520.13 <br />51 <br />5278,530,41 <br />12 <br />2360.502 <br />TYPE SP 12,5 NON WEARING COURSE MIXTURE (2,B) <br />TON <br />563.35 <br />1700 <br />1621.47 <br />0 <br />5102,720.12 <br />13 <br />2504.602 <br />ADJUST GATE VALVE <br />EACH <br />$76.00 <br />2 <br />5 <br />0 <br />5380.00 <br />14 <br />2506.522 <br />ADJUST FRAME & RING CASTING (MANHOLE) <br />EACH <br />5180.00 <br />29 <br />30 <br />0 <br />55,400.00 <br />15 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN D412 <br />LIN FT <br />516.50 <br />180 <br />319 <br />110 <br />$5,263.50 <br />16 <br />2535.501 <br />BITUMINOUS CURB <br />LIN FT <br />50.55 <br />1850 <br />1605 <br />0 <br />5882.75 <br />17 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />58..000.00 <br />0.4 <br />0,3998 <br />0 <br />$3,198.40 <br />18 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />53.00 <br />40 <br />40 <br />0 <br />5120.00 <br />19 <br />2575.519 <br />DISK ANCHORING <br />ACRE <br />51,140.00 <br />0.4 <br />0.4 <br />0 <br />$456.00 <br />20 <br />2582.502 <br />4" SOLID LINE WHITE-EPDXY <br />LIN FT <br />50.30 <br />10400 <br />10210 <br />0 <br />53,063.00 <br />21 <br />2582.502 <br />4" SOLID LINE YELLOW-EPDXY <br />LIN FT <br />50.30 <br />1020 <br />960 <br />0 <br />5288.00 <br />22 <br />2582.502 <br />4" BROKEN LINE YELLOW-EPDXY <br />LIN FT <br />50.30 <br />1040 <br />1210 <br />0 <br />$363.00 <br />23 <br />2582.503 <br />CROSSWALK MARKING-EPDXY <br />SQ FT <br />$7.40 <br />150 <br />84 <br />0 <br />$621.60 <br />Totals For A. SURFACE IMPROVEMENTS: <br />$495,874.24 <br />Project Totals: <br />$495.874.24 <br />