Laserfiche WebLink
City of Lino Lakes, MN 3 <br />Scope of Work: Project Specifications <br />The project specifications will include: <br />Section A <br />Section B <br />Advertisements for Bids <br />This section provides a detailed description of the project and meets the <br />requirements for legal advertisements. <br />Instruction to Bidders <br />This section provides precise instructions to bidders including the scope of <br />work, insurance, payments, time of completion, bidder qualifications, <br />taxes and permits, legal requirements, performance and payment bonds <br />and other important project information. <br />Section C Proposal <br />This section contains the bid proposals; construction time frame alternate <br />bid proposals, legal requirements, and the bidder and subcontractor <br />qualification forms. <br />Section D <br />Section E <br />Section F <br />Section G <br />Project Requirements <br />This section includes a complete description of the project, project <br />schedule(s), execution of contract documents; notice to proceed, project <br />meetings, quality assurance, liquidated damages, and legal and technical <br />requirements for executing the scope of work. <br />Technical Specifications <br />This section details the technical specifications for structural <br />modifications, surface repairs, interior and exterior surface preparation, <br />exterior abrasive blast containment, disposal of spent abrasives, <br />dehumidification, lettering and logo, submittals, workmanship, <br />unfavorable weather conditions, surface coating and material, repair work, <br />health and sanitary facilities, clean up, ventilation and safety requirements, <br />superintendent, inspection of work, sterilization of tank interiors, and <br />containment plan. <br />Supplemental Conditions <br />This section supplements or amends the General Conditions and/or other <br />provisions of the Contract Documents. <br />General Conditions <br />This section includes all the General Conditions designed for water tank <br />reconditioning, such as authority of the Engineer, engineering inspection, <br />modifications, additions and subtractions of scope of work, extensions of <br />time, insurance and other appropriate items. <br />